| Review of Linear Collider Designs and Path to the Future | 54 | ||
| M. Tigner, Cornell University, Ithaca, NY | |||
| PAPER | |||
| Luminosity Limitations at the Multi-TeV Linear Collider Energy Frontier | 59 | ||
| D. Schulte, CERN, Geneva | |||
| PAPER | |||
| Review of Ultra High-gradient Acceleration Schemes, Results of Experiments | 64 | ||
| R.W. Assmann, CERN, Geneva | |||
| PAPER - SLIDES | |||
| High Gradient Breakdown in Normal-Conducting RF Cavities | 134 | ||
| W. Wuensch, CERN, Geneva | |||
| PAPER - SLIDES | |||
| Measurement of Resistivity Dominated Collimator Wakefield Kicks at the SLC | 227 | ||
| M. Seidel, DESY, Hamburg; D. Onoprienko, Brunel University, Uxbridge, Middlesex; P. Tenenbaum, SLAC, Stanford | |||
| PAPER - SLIDES | |||
| HOM Beam Coupling Measurements at the TESLA Test Facility (TTF) | 230 | ||
| G. Devanz, M. Jablonka, C. Magne, O. Napoly, CEA, Gif-sur-Yvette; M. Huening, M. Wendt, DESY, Hamburg | |||
| PAPER - SLIDES | |||
| Beam Based Alignment at the KEK Accelerator Test Facility | 431 | ||
| M.C. Ross, J. Nelson, M. Woodley, SLAC, Stanford; A. Wolski, LBNL, Berkeley | |||
| PAPER | |||
| Status of the CLIC Study on Magnet Stabilization and Time-Dependent Luminosity | 446 | ||
| R.W. Assmann, W. Coosemans, G. Guignard, N. Leros, S. Redaelli, D. Schulte, I. Wilson, F. Zimmermann, CERN, Geneva | |||
| PAPER | |||
| Background Simulation for the CLIC Beam Delivery System with Geant | 449 | ||
| G.A. Blair, RHUL, Egham; H. Burkhardt, CERN, Geneva; H.-J. Schreiber, DESY, Zeuthen | |||
| PAPER | |||
| Damping of Higher Order Modes in a Planar 30 GHz Accelerating Structure | 452 | ||
| A. Blednykh, TU-Berlin, Berlin | |||
| PAPER | |||
| Vibrational Stability of NLC Linac Accelerating Structure | 458 | ||
| F. Le Pimpec, F. Asiri, G.B. Bowden, E. Doyle, B. McKee, A. Seryi, SLAC, Stanford; S. Redaelli, CERN, Geneva; S. Adiga, Stanford University, Stanford | |||
| PAPER | |||
| DEVELOPMENT OF STABLE SUPPORT STANDS FOR ACCELERATORS | 467 | ||
| H. Matsumoto, N. Sato, S. Takeda, KEK, Ibaraki-ken; M. Ohtsuka, N. Yoshimura, OHTSUKA Co., Tsukuba; H. Kitamura, T. Shintake, RIKEN, Hyogo; A. Suzuki, H. Yoshioka, TAKENAKA Co., Tokyo | |||
| PAPER | |||
| Numerical Calculation of Trapped Modes in TESLA Cavities Considering Production Tolerances* | 470 | ||
| W.F.O. Mueller, W. Koch, T. Weiland, TU-Darmstadt, Darmstadt | |||
| PAPER | |||
| Alternative RF Pulse Compression System Configurations for Linear Colliders | 473 | ||
| C.D. Nantista, Z.D. Farkas, R.D. Ruth, S.G. Tantawi, P.B. Wilson, SLAC, Stanford | |||
| PAPER | |||
| Tuning Knobs for the NLC Final Focus | 476 | ||
| Y. Nosochkov, P. Raimondi, T.O. Raubenheimer, A. Seryi, M. Woodley, SLAC, Stanford | |||
| PAPER | |||
| NLC Luminosity as a Function of Beam Parameters | 479 | ||
| Y. Nosochkov, P. Raimondi, T.O. Raubenheimer, A. Seryi, SLAC, Stanford | |||
| PAPER | |||
| New Concepts for Damping Rings | 482 | ||
| P. Raimondi, SLAC, Stanford; A. Wolski, LBNL, Berkeley | |||
| PAPER | |||
| The Effect of Cooling Water on Magnet Vibrations | 485 | ||
| S. Redaelli, R.W. Assmann, W. Coosemans, W. Schnell, CERN, Geneva | |||
| PAPER | |||
| Comparison of Different Tracking Codes for Beam Delivery Systems of Linear Colliders | 488 | ||
| S. Redaelli, R.W. Assmann, H. Burkhardt, D. Schulte, F. Zimmermann, CERN, Geneva; N. Walker, DESY, Hamburg; G.A. Blair, RHUL, Egham; Y. Nosochkov, T.O. Raubenheimer, A. Seryi, P. Tenenbaum, SLAC, Stanford | |||
| PAPER | |||
| Status of the CTF3 Commissioning | 491 | ||
| P. Royer, R. Corsini, B. Dupuy, L. Rinolfi, F. Tecker, CERN, Geneva; A. Ferrari, Uppsala University, Uppsala | |||
| PAPER | |||
| Electron Beam Combination by RF Deflectors: Tolerances and Requirements | 494 | ||
| P. Royer, R. Corsini, CERN, Geneva | |||
| PAPER | |||
| Stability of the Drive Beam in the Decelerator of CLIC | 497 | ||
| D. Schulte, CERN, Geneva | |||
| PAPER | |||
| CLIC Simulations from the Start of the Linac to the Interaction Point | 500 | ||
| D. Schulte, R.W. Assmann, T.E. D'Amico, G. Guignard, N. Leros, S. Redaelli, T. Risselada, F. Zimmermann, CERN, Geneva; G.A. Blair, RHUL, Egham | |||
| PAPER | |||
| Design of an E-H Tuner and an Adjustable Directional Coupler for High-power Waveguide Systems | 506 | ||
| N. Sobenin, B. Bogdanovich, M. Egorov, V. Kaminsky, V. Volkov, D. Zavadtsev, MEPhI, Moscow; M. Ebert, DESY, Hamburg | |||
| PAPER | |||
| Positron-Production Experiment in Tungsten Crystal using 4 and 8-GeV Channeling Electrons at the KEKB Injector Linac | 509 | ||
| T. Suwada, S. Anami, A. Enomoto, K. Furukawa, K. Kakihara, T. Kamitani, Y. Ogawa, S. Ohsawa, H. Okuno, T. Oogoe, KEK, Ibaraki-ken; T. Fujita, K. Umemori, K. Yoshida, Hiroshima University, Higashi-Hiroshima; R. Chehab, LAL, Orsay; V. Ababiy, A.P. Potylitsyn, I.E. Vnukov, TPU, Tomsk; R. Hamatsu, K. Sasahara, Tokyo Metropolitan University, Tokyo | |||
| PAPER | |||
| Beam Tilt Signals as Emittance Diagnostic in the Next Linear Collider Main Linac | 512 | ||
| P. Tenenbaum, J. Frisch, D. McCormick, M.C. Ross, S. Smith, SLAC, Stanford | |||
| PAPER | |||
| Beam-based Alignment of the TESLA Main Linac | 515 | ||
| P. Tenenbaum, SLAC, Stanford; R. Brinkmann, DESY, Hamburg; V. Tsakanov, YerPhI, Yerevan | |||
| PAPER | |||
| Recent Developments in the LIAR Simulation Code | 518 | ||
| P. Tenenbaum, L. Hendrickson, A. Seryi, G.V. Stupakov, SLAC, Stanford | |||
| PAPER | |||
| A New Lattice Design for the NLC Positron Pre-damping Ring | 521 | ||
| A. Wolski, LBNL, Berkeley | |||
| PAPER | |||
| Overview of Collective Effects in the NLC Main Damping Rings | 524 | ||
| A. Wolski, S. de Santis, LBNL, Berkeley | |||
| PAPER | |||
| Design Status of the CLIC Beam Delivery System | 530 | ||
| F. Zimmermann, M. Aleksa, R.W. Assmann, H. Burkhardt, S. Redaelli, T. Risselada, S. Russenschuck, D. Schulte, CERN, Geneva; A. Faus-Golfe, IFIC, Valencia; G.A. Blair, RHUL, Egham | |||
| PAPER | |||
| A Nonlinear Collimation System for CLIC | 533 | ||
| F. Zimmermann, CERN, Geneva; A. Faus-Golfe, IFIC, Valencia | |||
| PAPER | |||
| Optimization of CLIC Damping-Ring Design Parameters | 536 | ||
| F. Zimmermann, M. Korostelev, CERN, Geneva | |||
| PAPER | |||
| Status of SCSS: Spring-8 Compact SASE Source Project | 840 | ||
| T. Shintake, T. Hara, T. Inagaki, T. Ishikawa, Y. Kim, H. Kitamura, T. Tanaka, K. Togawa, SPring-8/RIKEN, Hyogo; H. Matsumoto, Y. Takasu, S. Takeda, M. Yoshida, KEK, Ibaraki-ken | |||
| PAPER | |||
| Performance of the TESLA Test Facility Linac | 876 | ||
| P. Castro, DESY, Hamburg | |||
| PAPER | |||
| Initial Results from Model Independent Analysis of the KEK ATF | 1205 | ||
| A. Wolski, LBNL, Berkeley; J. Nelson, M.C. Ross, M. Woodley, SLAC, Stanford | |||
| PAPER | |||
| Coaxial Wire Measurements in NLC Accelerating Structures | 1440 | ||
| N. Baboi, G.B. Bowden, V.A. Dolgashev, R.M. Jones, S.G. Tantawi, J.W. Wang, SLAC, Stanford | |||
| PAPER | |||
| A New Technique to Compute Long-Range Wakefields in Accelerating Structures | 1661 | ||
| J.-Y. Raguin, J. Prochnow, W. Wuensch, CERN, Geneva | |||
| PAPER | |||
| Computation of RF-Properties of Long and Complex Structures | 1685 | ||
| U. van Rienen, H.-W. Glock, D. Hecht, K. Rothemund, Universität Rostock, Rostock | |||
| PAPER | |||
| Study of a Magnetic Chicane at the FNAL/NICADD Photo-Injector using Remote Operation from DESY | 1759 | ||
| J.-P. Carneiro, K. Flöttmann, Ph. Piot, DESY, Hamburg; N. Barov, K. Desler, D. Edwards, FNAL, Batavia; M. Ferrario, INFN-LNF, Frascati (Roma) | |||
| PAPER | |||
| R&D Towards a Laser Based Beam Size Monitor for the Future Linear Collider | 1912 | ||
| T. Kamps, G.A. Blair, F. Poirier, RHUL, Egham; H. Lewin, S. Schreiber, N. Walker, K. Wittenburg, DESY, Hamburg | |||
| PAPER | |||
| Cryogenic Current Comparator for Absolute Measurements of the Dark Current of Superconducting Cavities for TESLA | 1915 | ||
| K. Knaack, M. Wendt, K. Wittenburg, DESY, Hamburg; R. Neubert, W. Vodel, FSU, Jena; A. Peters, GSI, Darmstadt | |||
| PAPER | |||
| Beam Position Monitor for the TESLA Energy Spectrometer | 1921 | ||
| A. Liapine, TU-Berlin, Berlin | |||
| PAPER | |||
| Coupler Studies for CLIC Accelerating Structures | 2187 | ||
| J.-Y. Raguin, S. Doebert, I. Syratchev, W. Wuensch, CERN, Geneva | |||
| PAPER | |||
| A New Tuner for TESLA | 2205 | ||
| D. Barni, A. Bosotti, C. Pagani, INFN Milano LASA, Segrate (MI); R. Lange, H.-B. Peters, DESY, Hamburg | |||
| PAPER | |||
| Characteristics of a Fast Piezo-Tuning Mechanism for Superconducting Cavities | 2256 | ||
| L. Lilje, D. Kostin, S.N. Simrock, DESY, Hamburg; M. Fouaidy, IPN, Orsay | |||
| PAPER | |||
| A Non-Electropolished Niobium Cavity Reached 40 MV/m at Saclay | 2292 | ||
| B. Visentin, A. Aspart, J.-P. Charrier, G. Congretel, Y. Gasser, J.P. Poupeau, CEA, Gif-sur-Yvette | |||
| PAPER | |||
| Features of FEM for Testing of High-gradient Accelerating Structures of Linear Colliders | 2308 | ||
| A.V. Elzhov, A.K. Kaminsky, E.A. Perelstein, S.N. Sedykh, A.P. Sergeev, JINR, Dubna, Moscow Region; N.S. Ginzburg, N.Yu. Peskov, A.S. Sergeev, Institute of Applied Physics RAS, Nizhny Novgorod | |||
| PAPER | |||
| 30 GHz Test Facility for Experimental Study of Accelerating Structure Damage due to the Pulse Heating | 2311 | ||
| A.V. Elzhov, I.N. Ivanov, A.K. Kaminsky, V.V. Kosukhin, E.A. Perelstein, S.N. Sedykh, A.P. Sergeev, JINR, Dubna, Moscow Region; N.S. Ginzburg, S.V. Kuzikov, N.Yu. Peskov, M.I. Petelin, A.S. Sergeev, N.I. Zaitsev, Institute of Applied Physics RAS, Nizhny Novgorod | |||
| PAPER | |||
| Development of High-gain Second-harmonic Gyroklystron for Accelerator Applications | 2320 | ||
| W. Lawson, S. Gouveia, V. Granatstein, B. Hogan, B. Huebschman, University of Maryland, College Park | |||
| PAPER | |||
| Development of an 805-MHz Pulsed Klystron for the Spallation Neutron Source | 2323 | ||
| S. Lenci, E. Eisen, B. Stockwell, CPI Inc., Palo Alto, CA | |||
| PAPER | |||
| Recent Progress in CW Klystrons at CPI | 2326 | ||
| S. Lenci, H. Bohlen, A. Mizuhara, B. Stockwell, E. Wright, CPI Inc., Palo Alto, CA | |||
| PAPER | |||
| Development of a 10-MW, L-Band, Multiple-Beam Klystron for TESLA | 2337 | ||
| E. Wright, A. Balkcum, H. Bohlen, M. Cattelino, L. Cox, M. Cusick, E. Eisen, F. Friedlander, S. Lenci, B. Stockwell, L. Zitelli, CPI Inc., Palo Alto, CA | |||
| PAPER | |||
| Power Supplies for TESLA Test Facility 2 | 2466 | ||
| H.-J. Eckoldt, DESY, Hamburg | |||
| PAPER | |||
| Ground Motion Studies near the Dam Site | 2661 | ||
| S. Takeda, KEK, Ibaraki-ken; T. Itoh, K. Tada, EPDC, Ginza, Tokyo | |||
| PAPER | |||