MC7: Accelerator Technology
T31 Subsystems, Technology and Components, Other
Paper Title Page
THPRB086 Design & Optimization of the Alignment Supports for the New Laminated Magnets for the CERN East Area Consolidation Project 4020
 
  • R. Vanhoutte, D. Brethoux, A. Ebn Rahmoun, S. Evrard, F.J. Harden, E. Harrouch, M. Lazzaroni, M. Lino Diogo dos Santos, R. Lopez, D.E. Nogtikov, J. Renedo Anglada
    CERN, Meyrin, Switzerland
 
  The East Area is one of CERNs experimental area, running since its foundation in 1958. Extracting a 24GeV proton beam from the Proton Synchrotron accelerator, the primary beam is divided into different secondary beams, serving various experiments and user’s facilities such as CLOUD, CHARM, IRRAD. Due to improved optics and an energy saving scheme, the facility will go under a renovation between 2019 and 2020, including the replacement of the magnets with new laminated ones to allow a cycled powering scheme. Those magnets need improved supports, and in some cases even a new design, to optimize the alignment operations in those areas. This article will mainly address the different proposed solutions for plug-in supports as well as for conventional ones.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2019-THPRB086  
About • paper received ※ 15 May 2019       paper accepted ※ 23 May 2019       issue date ※ 21 June 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
THPRB087 Study of the Energy Savings Resulting from the East Area Renovation 4023
 
  • B.LM. Lamaille, F. Dragoni, S. Evrard, F.J. Harden, E. Harrouch, M. Lazzaroni, R. Lopez, K.D. Papastergiou
    CERN, Meyrin, Switzerland
 
  CERN’s East Experimental Area, situated on the Swiss side of the Meyrin site, with its four beamlines, has served physics for more than 40 years. As the building and equipment are reaching their end of life, a thorough consolidation project has been initiated in order to pro-vide many more years of reliable operation. This article addresses the different proposed solutions to reduce significantly the energy consumption of the East Area. It outlines the methodology applied to estimate as precisely as possible the future attained energy savings, which will result in an estimated reduction of approximately 80% in electricity usage (from 11 GWh to 2 GWh per year) and of approximately 65% in gas usage for heating purpose (from 3 GWh to 1 GWh per year).  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2019-THPRB087  
About • paper received ※ 15 May 2019       paper accepted ※ 23 May 2019       issue date ※ 21 June 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
THPRB093 RF Data Acquisition and Soft Alarm System for the Taiwan Photon Source 4039
 
  • Z.K. Liu, F.Y. Chang, L.-H. Chang, M.H. Chang, S.W. Chang, L.J. Chen, F.-T. Chung, Y.T. Li, M.-C. Lin, C.H. Lo, Ch. Wang, M.-S. Yeh, T.-C. Yu
    NSRRC, Hsinchu, Taiwan
 
  The Taiwan Photon Source (TPS) is a modern, high brightness 3 GeV light source. A data acquisition pro-gram for the radio frequency (RF) system, including a transient data recorder, a long term data archiver and real time data monitoring, has been developed for the analysis of RF trips and RF system debugging. A soft alarm system is implemented as well utilizing EPICS and python packages. The hardware architecture and the functionality of the RF data acquisition and soft alarm system will be discussed in this article.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2019-THPRB093  
About • paper received ※ 09 April 2019       paper accepted ※ 22 May 2019       issue date ※ 21 June 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
THPTS004 The Sirius Heating System for the In-situ NEG Activation 4109
 
  • P.H. Nallin, M. Bacchetti, F.G.R. Carrera, D.R. Cavalcante, R.O. Ferraz, P.P.S. Freitas, G.R. Gomes, J.G. Hidalgo, R.T. Neuenschwander, F.A.M. Pinto, A.R.D. Rodrigues, R.M. Seraphim
    LNLS, Campinas, Brazil
 
  Sirius is a 3 GeV fourth-generation synchrotron light source under commissioning in Brazil, with 518 m circumference and a bare lattice emittance of 0.25 nm.rad. This ultra-low emittance machine is based on approximately 700 magnets with 28 mm typical gap. The standard vacuum chamber, that makes up around 80% of the circumference, is a 26 mm external diameter copper tube. Due to the small conductance of the chambers and the limited space between the magnets, the vacuum pumping will be based on distributed concept and then non­-evaporable getter (NEG) coating will be extensively used. To activate the NEG coating, the chambers must be heated at 200°C for about 24 hours. The solution for Sirius was the development of an ultra-thin heating tape, 0.4 mm thick, which allows an in-situ bake-out. The developed tapes are able to operate continuously at 220°C and have in their design a thermal shield that reduces the radiation heat loss to the magnets. This paper describes the development of the heating tape, its power supply, the control software and the operation of the system during the NEG activation at Sirius.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2019-THPTS004  
About • paper received ※ 15 May 2019       paper accepted ※ 22 May 2019       issue date ※ 21 June 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
THPTS007 MYRRHA 80 kW CW RF Coupler Design 4115
 
  • Y. Gómez Martínez, M.A. Baylac, D. Bondoux, F. Bouly, P.-O. Dumont
    LPSC, Grenoble Cedex, France
  • S. Blivet, C. Joly, J. Lesrel, H. Saugnac
    IPN, Orsay, France
  • W. Kaabi
    LAL, Orsay, France
 
  MYRRHA [1] (Multi Purpose Hybrid Reactor for High Tech Applications) is an Accelerator Driven System (ADS) project. Its superconducting linac will provide a 600 MeV - 4 mA proton beam. The first project phase based on a 100 MeV linac is launched. The Radio-Frequency (RF) couplers have been designed to handle 80 kW CW at 352.2 MHz. This paper describes the thermal, mechanical and RF studies leading to the final design of the RF coupler.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2019-THPTS007  
About • paper received ※ 10 May 2019       paper accepted ※ 23 May 2019       issue date ※ 21 June 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
THPTS008 Prospects of Additive Manufacturing for Accelerators 4118
 
  • N. Delerue, S. Jenzer
    LAL, Orsay, France
  • H.C. Carduner
    SUBATECH, Nantes, France
  • R.L. Gerard
    CERN, Meyrin, Switzerland
  • P.M. Manil
    CEA-DRF-IRFU, France
  • P.R. Repain
    LPNHE, Paris, France
  • A. Simar
    UCL, Louvain-la-Neuve, Belgium
 
  Funding: Université Paris-SAclay, Labex P2IO and P2I departement
Additive manufacturing allows the production of mechanical components often much faster than traditional manufacturing. Several accelerators components built using additive manufacturing have already been qualified for use in accelerator. A workshop was held in Orsay in December 2018 to discuss the prospects of using additive manufacturing for particle accelerators and particle detectors. We report here on the prospects as far as accelerators are concerned.
 
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2019-THPTS008  
About • paper received ※ 20 May 2019       paper accepted ※ 22 May 2019       issue date ※ 21 June 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
THPTS009 High-Current Emittance Measurements at MAMI 4121
 
  • S. Heidrich, K. Aulenbacher, M. Dehn, P. Heil
    IKP, Mainz, Germany
  • M.W. Bruker
    HIM, Mainz, Germany
 
  Funding: Work supported by BMBF-Verbundforschung Verbundprojekt 05H2015UMRB1, R&D Beschleuniger (Positronenquellen)
The effects of high beam currents and different types of electron sources on the emittance of the beam at the 3.5 MeV beamline of the Mainzer Microtron MAMI were observed. A thermionic BaO source and a GaAs-based photo-source that allows spin polarization were used. In order to measure the beam size, a new type of wire scanner was utilized. The results show maximum normalized emittance values in the order of a few hundred nmrad for both sources, which lies distinctly within the acceptance of the higher energy stages of the accelerator.
 
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2019-THPTS009  
About • paper received ※ 14 May 2019       paper accepted ※ 23 May 2019       issue date ※ 21 June 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
THPTS013 Further Designs of HOM Couplers for Superconducting 400 MHz RF Cavities 4132
SUSPFO022   use link to see paper's listing under its alternate paper code  
 
  • N.F. Petry, M. Busch, K. Kümpel, O. Meusel, H. Podlech
    IAP, Frankfurt am Main, Germany
 
  The Future Circular Collider (FCC) is one possible future successor of the Large Hadron Collider (LHC) at CERN. The proton-proton collider center-of-mass collision energy is set to 100 TeV with a beam current of 0.5 A. To achieve this energy a stable acceleration is critical and therefore higher order modes (HOM) need to be damped. HOM dampers, further characterized as couplers, need to fulfill several criteria to be efficient. As a first property the couplers should assure a longitudinal impedance of higher order modes of below 10 kW. Furthermore, the loaded Q-factor should be below 1000 and the corresponding R/Q value should be in the range of 10 Ω. Besides the Hook-type and Probe-type HOM coupler two additional designs were simulated. The recent results of the different couplers attached to a superconducting 400 MHz RF cavity will be presented.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2019-THPTS013  
About • paper received ※ 09 May 2019       paper accepted ※ 23 May 2019       issue date ※ 21 June 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
THPTS014 Visual Inspection of Curved Particle Accelerator Beam Pipes with a Modular Robot 4135
 
  • N. Schweizer
    RMR, TU Darmstadt, Darmstadt, Germany
  • I. Pongrac
    GSI, Darmstadt, Germany
 
  Inspecting ultra-high vacuum pipe systems of particle accelerators without disassembling the beam pipes is a complex challenge. In particular, curved sections of particle accelerators require a unique approach for the examination of the interior. For the planned heavy ion synchrotron SIS100 at FAIR, an inspection robot is currently under development, featuring an optical imaging system with which the robot can be navigated through the beam pipe. We present the current prototype, which is based on a modular snake-like robot with active wheels and joints. Due to the stipulated low movement velocity, it can be shown that a kinematic model is sufficient to control the robot whereas dynamical effects can be neglected. This concept is proven in experiments with the prototype. At the current development status, the robot is controlled manually by setting the velocity of the first module and its desired turning angle. In simulations we include a CAD model of a dipole chamber of the SIS100 and let an operator successfully navigate the robot through the beam pipe while only observing the camera image.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2019-THPTS014  
About • paper received ※ 14 May 2019       paper accepted ※ 21 May 2019       issue date ※ 21 June 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
THPTS019 Design of Beam Position Monitoring System for IPM Low Energy Electron LINAC 4394
SUSPFO033   use link to see paper's listing under its alternate paper code  
 
  • N. Messbah, F. Abbasi Davani
    Shahid Beheshti University, Tehran, Iran
  • S. Ahmadiannamin
    ILSF, Tehran, Iran
  • H. Shaker, M. Shirshekan
    IPM, Tehran, Iran
 
  A beam position monitor (BPM) is a common device used in particle accelerators to measure the position of a beam of charged-particles. The goal of this project is to simulate and build prototype of different parts to be used for IPM low energy electron Linac being developed at Institute for Research in Fundamental Sciences. The IPM low energy electron Linac will initially be operated at a 7𝜇sec pulse duration and 250 Hz repetition rate with 2.998 GHz bunching frequency. A 4.5-MeV electron beam will be available in the second phase of commissioning. The device is composed of two pickup S-band cavities and a detection circuit to read out the electron beam’s position. The electrode pickup sensors will sense the mode strength generated by the passing beam of electrons. The working modes are TM110 (dipole) for the so called position cavity and TM010 (monopole) for the reference cavity. When the beam crosses the two cavity gaps it induces signals proportional to the product of charge and position offset in the position cavity, and to the charge only in the reference cavity. the position cavity has four rectangular waveguides that couple to the dipole mode while rejecting the monopole mode that would otherwise limit the resolution of the electronics. This signal will be input to a detection circuit that will be used to calculate the signals detected by four antennas arranged. A 180 degree hybrid at the first stage reduce the monopole and a heterodyne receiver principle was used to down-convert the signal frequency in about MHz IF frequency. These signals can then be used to determine the beam’s displacement from the center.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2019-THPTS019  
About • paper received ※ 15 May 2019       paper accepted ※ 24 May 2019       issue date ※ 21 June 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
THPTS026 Effect of Nitric Hydrofluoric Acid Treatment on Brazing of Alumina Ceramics and Pure Titanium 4161
 
  • M. Kinsho, J. Kamiya
    JAEA/J-PARC, Tokai-mura, Japan
  • K. Abe
    Hitachi Power Semiconductor Device, Ltd., Hitachishi, Ibaraki, Japan
  • T. Nakamura
    Asahi Kinzoku Co., Ltd., Gifu, Japan
 
  Alumina ceramics vacuum chamber which is used for the 3GeV rapid-cycling synchrotron (RCS) in J-PARC is composed of alumina duct, titanium (Ti) flanges and Ti sleeves. Before brazing the alumina duct and the Ti sleeves, the Ti sleeves were treated with nitric hydrofluoric acid. The purpose of this study is to clear the effect of this treatment for titanium material. It was cleared by SEM observation that the roughness of the titanium material after the nitric hydrofluoric acid treatment becomes big. It was also measured that the thickness of oxide film on surface of the titanium material was 12.7 nm before treatment and 6.0 nm after treatment. As a result of measuring the wettability of the brazing material which was silver brazing filler metal (Ag: 72%, Cu: 28%) on the Ti surface and the diffusion of the Ti material into the brazing material, it became clear that both the clearing of oxide layer on the alumina ceramics and the vacuum condition of the vacuum heating furnace were important for brazing between alumina ceramics and pure titanium.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2019-THPTS026  
About • paper received ※ 14 May 2019       paper accepted ※ 23 May 2019       issue date ※ 21 June 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
THPTS031 Simulations of the Activation of a Proton Therapy Facility Using a Complete Beamline Model With BDSIM 4176
 
  • R. Tesse, E. Gnacadja, C. Hernalsteens, N. Pauly
    ULB - FSA - SMN, Bruxelles, Belgium
  • S.T. Boogert, L.J. Nevay, W. Shields
    JAI, Egham, Surrey, United Kingdom
  • C. Hernalsteens
    IBA, Louvain-la-Neuve, Belgium
 
  A detailed model of the IBA Proteus One compact gantry system has been created with BDSIM (Beam Delivery Simulation) that has been validated against experimental data. Results regarding activation studies have been obtained for the first time using seamless simulations of the transport of protons in the beamline and their interactions with the environment. The activation of the concrete shielding of the system is estimated after a period of 20 years of operation. These main results are presented and discussed in detail.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2019-THPTS031  
About • paper received ※ 15 May 2019       paper accepted ※ 22 May 2019       issue date ※ 21 June 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
THPTS034 Design and Progress of Mechanical Support in HEPS 4180
 
  • C.H. Li, Y. Jiao, M.X. Li, H. Wang, Z. Wang, L. Wu, N. Zhou
    IHEP, Beijing, People’s Republic of China
 
  HEPS is a new generation synchrotron facility on construction with very low emittance. Stringent requirements are proposed to the design of mechanical support. The alignment error between girders should be less than 50μm. Based on that, the adjusting resolution of the girder are required to be less than 5μm in both transverse and vertical directions. Besides, the Eigen frequency of magnet & girder assembly should be higher than 54Hz to avoid the amplification of ground vibrations. To fulfill these requirements, studies on mechanical support design is now being carried out in HEPS. This paper will describe the design and progress of those work.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2019-THPTS034  
About • paper received ※ 14 May 2019       paper accepted ※ 23 May 2019       issue date ※ 21 June 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
THPTS037 The Deformation-Stress Simulation and Measurement of Titanium Foil Strip for Hadron Monitor 4187
 
  • A.X. Wang, J.X. Chen, H.Y. He, L. Liu, X.J. Nie, C.J. Ning, J.L. Sun, G.Y. Wang, J.B. Yu, Y.J. Yu, J.S. Zhang, D.H. Zhu
    IHEP CSNS, Guangdong Province, People’s Republic of China
  • L. Kang
    IHEP, Beijing, People’s Republic of China
 
  The measurement of beam profile by hadron monitor is in fact the measurement of the positive current after the secondary electrons escaped. According to the situation that the number of beam particles is small and the current signal is weak, the material titanium with high secondary electron generation rate is select by material comparison, and the foil strip type is used to increase the cross section area to obtain lager current level. On account of dead weight itself, as well as thermal expansion and contraction, the foil strip shall be loose. The loosen strip will deviate from its theoretical position, and cause the measuring error. Therefore, the deformation-stress of Ti foil strip (1000*50*0.1) was simulated under the pretension (10~90N) with the finite element software ANSYS. A set of experiment device with pretension adjustment and heating for the foil strip was designed, and then the deformation-stress was tested by a high precision 3-D imaging measurement system. Compared with the simulation results, the pretension would better set at about 50N.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2019-THPTS037  
About • paper received ※ 12 May 2019       paper accepted ※ 19 May 2019       issue date ※ 21 June 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
THPTS039 DESIGN OF A COMPACT VARIABLE X-BAND RF POWER SPLITTER 4194
 
  • F. Liu, H.B. Chen, J.Y. Liu, Z.N. Liu, J. Shi, H. Zha
    TUB, Beijing, People’s Republic of China
 
  This paper presents a design of a compact variable X-band RF power splitter. The RF power splitter includes one input port and two output ports, and the power divi-sion ratio can be adjusted by changing the position of a short circuit piston. This system keeps a good match (less than -40 dB) at any power division ratio. An E-bend waveguide structure is selected to make the geometry more compact (11cm in length, 3.5cm in width and 5 cm in height). Special studies was conducted to sustain a low surface electrical field (maximum 65 MV/m at 100 MW input), and large bandwidth (250MHz). This power split-ter is designed for high-power test stand at Tsinghua Uni-versity.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2019-THPTS039  
About • paper received ※ 14 May 2019       paper accepted ※ 23 May 2019       issue date ※ 21 June 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
THPTS040 Preliminary Design of Mechanical Supports for the Booster of Heps 4197
 
  • H. Wang, C.H. Li, C. Meng, H. Qu
    IHEP, Beijing, People’s Republic of China
 
  The Booster of High Energy Photon Source (HEPS) is a 454 meters ring with the repeat frequency of 1 Hz. The natural frequency of the magnets and their support as-sembly should be higher than 30 Hz. The alignment re-quirements on quadrupole and sextupole are better than 0.1 mm in x and y direction. This paper will discuss the preliminary design of the mechanical supports in Booster ring, as well as the discussion of finite element analyses results.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2019-THPTS040  
About • paper received ※ 30 April 2019       paper accepted ※ 23 May 2019       issue date ※ 21 June 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
THPTS041 Progress and TDR Plans of the Mechanical System of CEPC 4200
 
  • H. Wang, S. Bai, M.X. Li, Y.D. Liu, C. Meng, H. Qu, J.L. Wang, P. Zhang, N. Zhou
    IHEP, Beijing, People’s Republic of China
 
  The TDR of CEPC is aimed at the key science and technology problems and makes preparations for the real project. This paper will describe the progress of mechanical system including the regular supports and transport vehicle design, the mockup plan, the installation scenario of machine detector interface (MDI) and the movable collimator, as well as the TDR plans of mechanical system.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2019-THPTS041  
About • paper received ※ 28 April 2019       paper accepted ※ 22 May 2019       issue date ※ 21 June 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
THPTS054 A Novel Approach to Triggering and Beam Synchronous Data Acquisition 4224
 
  • T. Šuštar
    Cosylab, Villigen, Switzerland
  • P. Bucher, G. Theidel
    PSI, Villigen PSI, Switzerland
  • R. Modic
    Cosy lab, Ljubljana, Slovenia
 
  SwissFEL, the new Free-Electron Laser facility is a 740 m long accelerator with the goal of providing pulses of light between 6 and 30 fs long at a wavelength of 1 to 7 Å at 100 Hz*. To support shot-to-shot photon diagnostic* and link the measurements to other measurements along the machine that belong to the same machine pulse, a new triggering and data acquisition system was developed. A new protocol was introduced which allows deterministic triggering, configuration and data transfer via one full-duplex optical connection. The measurement data is stamped with an unique pulse identifier, delivered from the SwisFEL Timing System**. A readout and control interface was developed to support data delivery to the Data Acquisition Dispatching Layer* and for controlling the system.
* Milne, et al., SwissFEL: The Swiss X-Ray Free-Electron Laser, Appl. Sci. 2017, 7(7), 720
** Kalantari, Biffiger, SwissFEL Timing System: First Opreational Experience, ICALEPC2017
 
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2019-THPTS054  
About • paper received ※ 15 May 2019       paper accepted ※ 23 May 2019       issue date ※ 21 June 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
THPTS065 Analysis on the Thermal Response to Beam Impedance Heating of the Post Ls2 Proton Synchrotron Beam Dump 4260
 
  • L. Teofili, F. Giordano, I. Lamas, F.-X. Nuiry, G. Romagnoli, B. Salvant
    CERN, Geneva, Switzerland
  • M. Marongiu, M. Migliorati
    Sapienza University of Rome, Rome, Italy
 
  The High Luminosity Large Hadron Collider (HL-LHC) and the LIU (LHC-Injection Upgrade) projects at CERN are upgrading the whole CERN accelerators chain, increasing beam brightness and intensity. In this scenario, some critical machine components have to be redesigned and rebuilt. Due to the increase in beam intensity, minimizing the electromagnetic interaction between the beam and the device is a crucial design task. Indeed, these interactions could lead to beam instabilities and excessive thermo-mechanical loadings in the device. In this context, this paper presents an example of multi-physics study to investigate the impedance related thermal effects. The analysis is performed on the conceptual design of the new proton synchrotron (PS) internal dump.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2019-THPTS065  
About • paper received ※ 26 April 2019       paper accepted ※ 22 May 2019       issue date ※ 21 June 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
THPTS069 A Monitoring System for TPS Linac 4272
 
  • C.L. Chen, H.-P. Chang, C.-S. Fann, K.L. Tsai
    NSRRC, Hsinchu, Taiwan
 
  Abstract Since 2014, TPS Linac system has been operating regularly. In order to keep a high stability during a long operating time, it is important to develop a monitoring system to monitor all sub-systems, parameters, including setting values, reading values, control inputs and outputs. This system is not only recording all above mentioned parameters, but also provides an efficient diagnosis in case of troubleshooting. Because the controlling system in TPS Linac is using Siemens S7-300 PLCs, Simatic WinCC is utilized to develop a historical archiving, operational analyses, and operator activities in operation. This paper attempts to show a complete solution for the integrated software structure and its resulting process analysis.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2019-THPTS069  
About • paper received ※ 14 May 2019       paper accepted ※ 23 May 2019       issue date ※ 21 June 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
THPTS070 Diagnostic Tool For CompactPCI Crates 4275
 
  • H.Z. Chen, C.H. Chen, Y.-S. Cheng, K.T. Hsu, K.H. Hu, C.Y. Liao, C.Y. Wu
    NSRRC, Hsinchu, Taiwan
 
  On the control system hardware platform for the Taiwan Photon Source (TPS) more than half use CompactPCI crates. If a crate malfunctions, the internal crate card will not operate properly affecting accelerator operation. If the crate, however, could provide instant remote operational information, an opportunity exists to maintain or replace it in advance. Therefore, a diagnostic tool was developed to analyse and diagnose the condition of the crates. When abnormal operations occur, an alarm can be issued for early inspection and maintenance. This way it is possible to prevent the EPICS IOC from crashing by CompactPCI crates, which improves the reliability of accelerator operation. A detailed system architecture, implementation and progress will be discussed in this report.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2019-THPTS070  
About • paper received ※ 14 May 2019       paper accepted ※ 22 May 2019       issue date ※ 21 June 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
THPTS077 Beam Instability Induced by RF System of an FEL-THZ Source 4298
SUSPFO004   use link to see paper's listing under its alternate paper code  
 
  • X.D. Tu, G. Feng, S.J. He, T. Hu, J. Jiang, S.Y. Lu, Y.Q. Xiong
    HUST, Wuhan, People’s Republic of China
 
  An SLAC-like Compact Linac installed on the HUST FEL-THz has been used as an injector to produce high power THz radiation. To meet the requirements of monochromaticity and repeatability for FEL, performance of electron beam and stability of RF system are notable. According to the existing facility, based on measurement results of RF jitter, instability of beam has been calculated, and it has been verified in relevant experiments. Furthermore, stability targets in RF system has been pro-posed in this paper.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2019-THPTS077  
About • paper received ※ 14 May 2019       paper accepted ※ 23 May 2019       issue date ※ 21 June 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
THPTS080 Novel Technique Ion Assisted In-Situ Coating of Long, Small Diameter, Accelerator Beam Pipes with Compacted Thick Crystalline Copper Film 4301
 
  • A. Hershcovitch, M. Blaskiewicz, J.M. Brennan, W. Fischer, G.T. McIntyre, S. Verdú-Andrés
    BNL, Upton, Long Island, New York, USA
  • A.X. Custer, M.Y. Erickson, H.J. Poole
    PVI, Oxnard, California, USA
 
  Funding: Work supported by Brookhaven Science Associates, LLC under Contract No. DE-AC02-98CH10886 with the U.S. Department of Energy
Although great progress was made with in-situ copper coating, by magnetron sputtering, to address the high room temperature resistivity, literature indicates that conventionally deposited thick copper films do not retain the same RF conductivity at cryogenic temperatures, since straightforward deposition tends to result in films with columnar structure and other lattice defects, which cause significant conductivity degradation at cryogenic temperatures. We utilize energetic ions for ion assisted deposition (IAD) to reduce lattice imperfections, for coating. IAD that can in-situ coat long small diameter tubes with compacted crystalline structure thick copper films has been developed. Moreover, development of techniques and devices can resurrect IAD for other applications, which have been impractical and/or not viable economically. Comparison of conductivity at cryogenic temperatures between straight magnetron physical vapor deposition and IAD will be presented.
 
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2019-THPTS080  
About • paper received ※ 15 May 2019       paper accepted ※ 22 May 2019       issue date ※ 21 June 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
THPTS081 Novel Apparatus and Technique for Measuring RR Resistivity of Tube Coatings at Cryogenic Temperatures 4304
 
  • A. Hershcovitch, J.M. Brennan, R. Than, S. Verdú-Andrés, Q. Wu
    BNL, Upton, Long Island, New York, USA
  • A.X. Custer, M.Y. Erickson, H.J. Poole
    PVI, Oxnard, California, USA
 
  Funding: Work supported by Brookhaven Science Associates, LLC under Contract No. DE-AC02-98CH10886 with the U.S. Department of Energy
A unique apparatus for measuring RF resistivity of tubes and coated tubes at cryogenic temperatures is operational at BNL, which to our knowledge is the first of its kind. A folded quarter wave resonator structure of 300 mm length accesses a wide range of frequencies. The structure is cooled in liquid He bath at 4 K. All internal resonator components (except for test samples) were fabricated out of superconducting materials. Consequently, when the resonator is cooled, the bulk of the losses are due to the copper coating. The RF resistivity is determined from Q measurements, since for a fixed geometry the quality factor of a resonant cavity is proportional to the square root of the conductivity. The RF input loop and the output signal antenna are adjustable when cold via bellows to control matching to each cavity mode. The Q values of 10 resonant modes between 180 and 2500 MHz are deduced from the bandwidth of the S21 response Network Analyzer measurements. CST MicroWave Studio is used to extract the resistivity of the samples from the Q measurements. Resistivity results of solid Cu tube, 2, 5, & 10 μm Cu coated 316LN stainless steel RHIC beam tubes will be presented.
 
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2019-THPTS081  
About • paper received ※ 15 May 2019       paper accepted ※ 22 May 2019       issue date ※ 21 June 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
THPTS086 Design of a CCD-based Laser Alignment Detection System 4311
 
  • J.X. Chen
    IHEP CSNS, Guangdong Province, People’s Republic of China
  • X.Y. He, W. Wang, H.T. Zhang
    USTC/NSRL, Hefei, Anhui, People’s Republic of China
 
  Funding: Work supported by National Natural Science Foundation of China (11705199)
Accelerator online alignment technology is an important means for accelerator stability detecting. A CCD-based laser alignment detection system is designed for the linear accelerator, and the detection distance of the system could reach 100m. The reference comparison method is used to detect the laser imaging position acquired by the reference detector at different times, and to obtain the relative positional deviation of the measurement reference or the tested objects. Through the measurement error analysis, the precision of the system is expected to reach ±10μm.
 
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2019-THPTS086  
About • paper received ※ 11 April 2019       paper accepted ※ 22 May 2019       issue date ※ 21 June 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
THPTS103 First Results of the Analytical Method Used to Reduce Downtime Risk at an Accelerator Facility 4349
 
  • W.C. Barkley, M.J. Borden, R.W. Garnett, M.S. Gulley, E.L. Kerstiens, M. Pieck, D. Rees, F.E. Shelley, B.G. Smith
    LANL, Los Alamos, New Mexico, USA
 
  Funding: DOE
The Los Alamos Neutron Science Center (LANSCE), like many other accelerator facilities, was built decades ago and has been repurposed when new missions were adopted. With an ongoing beam availability expectation of at least 80% delivered to the Experimental Areas (EAs), a balance between cost of spare equipment and budget has always been a challenge. Beam availability data has been meticulously captured and binned over the years to completely characterize the Structures, Systems and Components (SSCs) and other factors that have caused or contributed to accelerator downtime. Over these years, a critical spares list prioritized the spare equipment purchases that were deemed most critical by the management team. In the span of the years 2013 ’ 2015, significant accelerator upgrades and equipment replacements were performed in a set of activities known as LANSCE-RM. Last year, a new risk-based approach was developed by the management team that included an analytical assessment and a quantitative evaluation of probability and consequence. The resulting risk register (risk-based equipment list) is being used to guide decisions on funding requests and provide justification to mitigate operational risks. A paper by the same authors was published at LINAC 2018 describing this risk-based approach that serves to reformulate the critical spares list. This paper, in the sections that follow, expands on the approach by detailing the specific results of the analyses that led to the first risk register. Additionally, it evaluates the historical beam downtime at LANSCE compared to the current funding allocation choices made to increase the reliability.
 
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2019-THPTS103  
About • paper received ※ 10 May 2019       paper accepted ※ 23 May 2019       issue date ※ 21 June 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)