RIS citation export for THPTS103: First Results of the Analytical Method Used to Reduce Downtime Risk at an Accelerator Facility

TY  - CONF
AU  - Barkley, W.C.
AU  - Borden, M.J.
AU  - Garnett, R.W.
AU  - Gulley, M.S.
AU  - Kerstiens, E.L.
AU  - Pieck, M.
AU  - Rees, D.
AU  - Shelley, F.E.
AU  - Smith, B.G.
ED  - Boland, Mark
ED  - Tanaka, Hitoshi
ED  - Button, David
ED  - Dowd, Rohan
ED  - Schaa, Volker RW
ED  - Tan, Eugene
TI  - First Results of the Analytical Method Used to Reduce Downtime Risk at an Accelerator Facility
J2  - Proc. of IPAC2019, Melbourne, Australia, 19-24 May 2019
CY  - Melbourne, Australia
T2  - International Particle Accelerator Conference
T3  - 10
LA  - english
AB  - The Los Alamos Neutron Science Center (LANSCE), like many other accelerator facilities, was built decades ago and has been repurposed when new missions were adopted. With an ongoing beam availability expectation of at least 80% delivered to the Experimental Areas (EAs), a balance between cost of spare equipment and budget has always been a challenge. Beam availability data has been meticulously captured and binned over the years to completely characterize the Structures, Systems and Components (SSCs) and other factors that have caused or contributed to accelerator downtime. Over these years, a critical spares list prioritized the spare equipment purchases that were deemed most critical by the management team. In the span of the years 2013 ’ 2015, significant accelerator upgrades and equipment replacements were performed in a set of activities known as LANSCE-RM. Last year, a new risk-based approach was developed by the management team that included an analytical assessment and a quantitative evaluation of probability and consequence. The resulting risk register (risk-based equipment list) is being used to guide decisions on funding requests and provide justification to mitigate operational risks. A paper by the same authors was published at LINAC 2018 describing this risk-based approach that serves to reformulate the critical spares list. This paper, in the sections that follow, expands on the approach by detailing the specific results of the analyses that led to the first risk register. Additionally, it evaluates the historical beam downtime at LANSCE compared to the current funding allocation choices made to increase the reliability.
PB  - JACoW Publishing
CP  - Geneva, Switzerland
SP  - 4349
EP  - 4351
KW  - target
KW  - linac
KW  - operation
KW  - DTL
KW  - vacuum
DA  - 2019/06
PY  - 2019
SN  - 978-3-95450-208-0
DO  - DOI: 10.18429/JACoW-IPAC2019-THPTS103
UR  - http://jacow.org/ipac2019/papers/thpts103.pdf