Paper | Title | Other Keywords | Page |
---|---|---|---|
TUYMH03 | Recommissioning and Perspectives of VEPP-2000 Complex | collider, luminosity, detector, positron | 39 |
|
|||
VEPP-2000 is electron-positron collider exploiting the novel concept of round colliding beams. After three seasons of data taking in the whole energy range of 160-1000 MeV per beam it was stopped in 2013 for injection chain upgrade. The linking to the new BINP source of intensive beams together with booster synchrotron modernization provides the drastic luminosity gain at top energy of VEPP-2000. Recomissioning status, fist results and perspectives of the VEPP-2000 complex will be presented. | |||
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | ||
WEXMH01 | Feeding BINP Colliders with the New VEPP-5 Injection Complex | positron, electron, linac, damping | 56 |
|
|||
VEPP-4 and VEPP-2000 e+e− colliders are switching to feed from VEPP-5 Injection Complex via newly constructed K-500 beam transfer line. Since first operation of K-500 at the end of 2015 injection complex delivered e+ and e- beams to VEPP-2000 facility and is getting ready to work with VEPP-4. Upgraded injection chain demonstrated ability to provide design luminosity toVEPP-2000 and techniques of reliable operation are now under development. The designand operation experience of Injection Complex and transfer lines will be presented. | |||
![]() |
Slides WEXMH01 [6.228 MB] | ||
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | ||
WECAMH01 | Some Problems of the Beam Extraction from Circular Accelerators | extraction, controls, booster, resonance | 61 |
|
|||
In this article some problems of optimizing the output beam of particles from the circular accelerator are discussed. In particular, we consider some problems of matching the booster, Nuclotron and collider in the NICA project. The main attention is paid to the matching of the extraction beam systems. The proposed approach allows providing qualitative and quantitative analysis of the impact of various factors of the corresponding control systems. | |||
![]() |
Slides WECAMH01 [1.912 MB] | ||
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | ||
WECBMH02 | Collector Ring Project at FAIR: Present Status | quadrupole, lattice, sextupole, operation | 86 |
|
|||
In November 2013, the FAIR management delegated the responsibility for the technical design, construction, installation, and commissioning of the whole CR and its components from GSI to Budker Institute of Nuclear Physics (BINP). Since that time a lot of modifications of the original design were made aiming to improve the beam parameters and the machine performance. This work shows the present status of the development. | |||
![]() |
Slides WECBMH02 [20.497 MB] | ||
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | ||
FRCAMH05 | Booster Synchrotron at NICA Accelerator Complex | booster, kicker, ion, dipole | 160 |
|
|||
NICA is the new complex being constructed on the JINR aimed to provide collider experiments with ions up to aurum at energy of 4.5x4.5 GeV/u. The NICA layout includes 600 MeV/u Booster synchrotron as a part of the injection chain of the NICA Collider. The main goals of the Booster are the following: accumulation of 4E109 Au31+ ions; acceleration of the heavy ions up to energy required for effective stripping; forming of the required beam emittance with electron cooling system. The layout makes it possible to place the Booster having 210.96 m circumference and four fold symmetry lattice inside the yoke of the former Synchrophasotron. The features of the Booster, its main systems, their parameters and current status are presented in this paper. | |||
![]() |
Slides FRCAMH05 [16.830 MB] | ||
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | ||
FRCAMH06 | Simulation of Two-Plane Painting Multiturn Injection into BRing with Space Charge Effect | space-charge, simulation, septum, emittance | 163 |
|
|||
The new project HIAF is under design now in IMP (Lanzhou, China). One of the aim of the project is to accumulate about 1.4·1011 ions U34+ in the booster ring (BRing) at the injection energy 17 MeV/u. Two-plan injection procedure in horizontal and vertical spaces was proposed to fill out full acceptance of BRing. The optimization of injection parameters is presented in this report. The space charge effect was estimated with the molecular dynamics technique which was effectively used for the crystalline beam simulation. | |||
![]() |
Slides FRCAMH06 [4.324 MB] | ||
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | ||
TUPSA001 | Commissioning of e+/e− Transfer Line from BINP Injection Complex to VEPP-2000 Facility | dipole, controls, collider, positron | 213 |
|
|||
Funding: The work is supported by the Ministry of Education and Science of the Russian Federation and by grant NSh-10088.2016.2. Commissioning of e+/e− transfer line from Injection Complex to VEPP-2000 facility is done in 2016. Both electrons and positrons beams are injected to VEPP-2000 collider. The channel layout, lattice functions, magnetic elements, beam diagnostic system, vacuum system and control system are presented in this article. The details of commissioning process are also mentioned. |
|||
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | ||
TUPSA007 | New Experimental Results on RF Accelerator with Parallel-Coupled Structure and RF Controlled Gun | electron, gun, focusing, cavity | 222 |
|
|||
New data on the development and experimental investigation of the RF accelerator based on the 9-cavities parallel-coupled accelerating structure that is equipped with a high-frequency grid-controlled electron gun are presented. Accelerating structure, injection system and focusing system are improved. Previously observed second emission resonant discharge - multipactor is suppressed by increasing the field amplitude in the structure first cavity and using the protector. The parameters of the accelerated beam close to the design ones, i.e. electron energy up to 8 MeV, capture to the acceleration mode up to 100%, were received. Capture is provided by the RF electron focusing of the microwave field structure with usage of the magnetic focusing system based on permanent magnets and RF grid control in the electron gun. | |||
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | ||
TUPSA058 | Production of Intense Beams of Iron Ions from ECR Ion Source by MIVOC Method at the Cyclotron DC-60 | ion, cyclotron, acceleration, ion-source | 328 |
|
|||
The report describes the experiments carried out in 2015 at the accelerator complex DC-60 of Astana branch of the INP (Alma-Ata, Kazakhstan Republic), to develop methods for production of intense beams of milticharged ions of iron with the use of volatile compounds (Metal Ions from Volatile Compounds - MIVOC). As a result of performed work for the first time at DC-60 cyclotron a beam of iron ions was obtained, acceleration mode of 56Fe10+ ions to the energy of 1.75 MeV / nucleon was optimized. | |||
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | ||
WEPSB012 | On The Beam Dynamics Simulation In The Injection System | simulation, software, controls, rfq | 382 |
|
|||
When developing a particle accelerator for generating the high-precision beams, the injection system design is of importance, because it largely determines the output characteristics of the beam. At the present paper we consider the injection systems consisting of electrodes with given potentials. The design of such systems requires carrying out simulation of beam dynamics in the electrostatic fields. For external field simulation we use the new approach, proposed by A.D. Ovsyannikov, which is based on analytical approximations, or finite difference method, taking into account the real geometry of the injection system. The software designed for solving the problems of beam dynamics simulation and optimization in the injection system for non-relativistic beams has been developed. Both beam dynamics and electric field simulations in the injection system, that use analytical approach and finite difference method have been made and the results presented in this paper. | |||
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | ||
WEPSB037 | Beam Transfer From Heavy-Ion Linear Accelerator HILAC Into Booster of NICA Accelerator Complex | booster, kicker, ion, emittance | 443 |
|
|||
Designs of systems of ion beam transfer from the linear accelerator HILAC into the Booster of the NICA accelerator complex (JINR, Dubna) including the transport beam line HILAC-Booster and the beam injection system of the Booster are considered in the report. The proposed systems provide multivariant injection for accumulation of beams in the Booster with required intensity. Special attention is paid to various aspects of beam dynamics during its transfer. Main methods of beam injection into the Booster are described. These are single-turn, multiturn and multiple injection ones. Results of beam dynamics simulations are presented. Status of technical design and manufacturing of the systems' equipment is also highlighted. | |||
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | ||
WEPSB038 | Multigap and Polyharmonic Bunching Systems at FLNR Cyclotrons | ion, cyclotron, bunching, ECR | 446 |
|
|||
Since 1997, different variants of bunching systems have been used at the axial injections of FLNR cyclotrons to increase ions capture into acceleration efficiency. Combination of two single gap Sine and Line bunchers are used at the axial injections of U400 and DC110 cyclotrons. Since 2015, a single gap double RF harmonic buncher has been installed into the upper part of the U400M injection in addition to the lower sine buncher, the experimental results will be presented. For the HV axial injection of the new DC280 cyclotron, two variants of polyharmonic bunchers will be used: a multigap buncher and a single gap one. | |||
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | ||
WEPSB046 | A Cyclotron Complex for Acceleration of Carbon Ions | cyclotron, ion, extraction, acceleration | 467 |
|
|||
An accelerating complex for hadron therapy is proposed. Facility consists of two superconducting cyclotrons and is aimed to produce beams of 12C6+ ions with energy of 400 MeV/nucleon. Accelerator-injector is a compact 70 MeV/nucleon cyclotron. Main machine is separated sector cyclotron consisting of six magnets. Basic features of the main cyclotron are high magnetic field, compact size, and feasible design of a magnetic system. The advantages of the dual cyclotron design are typical of cyclotron-based solutions. The first design studies of the sector magnet of the main cyclotron show that the beam dynamics is acceptable with the obtained magnetic field. Due to its relatively compact size (outer diameter of 12 m) the complex can be an alternative to synchrotrons. Design study of the main cyclotron is described here. | |||
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | ||
THPSC013 | The Nonsymmetrical Variant of the Nonferromagnetic Extraction Kicker Magnet of the NICA Booster | kicker, extraction, booster, acceleration | 566 |
|
|||
Development and creation of the NICA acceleration complex are continued at JINR (Dubna). One of the main facilities of the complex is the Booster in which preliminary acceleration and cooling of an ion beam is performed. Further acceleration is fulfilled in the circular accelerator NUCLOTRON. The beam transfer from the Booster into the NUCLOTRON is provided by means of the fast extraction system and one of its central elements is the kicker magnet. For the beam deflecting into the extraction septum-magnet it is supposed to use the nonferrous kicker magnet consisting of two couples of conductors. Recent changes made in configuration of the Booster extraction section demand decrease of the kicker magnet length that leads to change of the beam extraction scheme. This report is devoted to the choice of the alternative design of the magnet (the nonsymmetrical variant). | |||
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | ||
THPSC024 | The Pulsed High Voltage Power Supply for the NICA Booster Injection System | power-supply, booster, controls, TANGO | 592 |
|
|||
Three pairs of electrostatic deflecting plates will be used in the injection system of booster ring. The electric circuit and design of the power supply system for one plate are presented in the report. The experimental results of testing are also presented. | |||
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | ||
THPSC061 | Beam Diagnostics Overview for Collector Ring at FAIR | diagnostics, ion, antiproton, beam-diagnostic | 676 |
|
|||
The Collector Ring (CR) is a dedicated storage ring in the FAIR project, where the main emphasis is laid on the effective stochastic precooling of intense secondary beams of stable ions, rare isotopes or antiprotons. A complex operation scheme with several types of operational cycles with beams in CR starting from injection, RF gymnastics, stochastic cooling then, and finishing to extraction is foreseen. Beam parameters changes significantly during the cycles. This demands an exceptional high dynamic range for the beam instrumentation. Non-destructive methods are mandatory for high currents as well as for the low current secondary beams due to the low repetition rate. Precise measurements of all beam parameters and automatic steering with short response time are required due to the necessary exploitation of the full ring acceptances. An overview of the challenges and solutions for various diagnostic installations will be given. | |||
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | ||
THPSC074 | Longitudinal Beam Distribution Measurements in Damping Ring of VEPP-5 Injection Complex | damping, impedance, electron, operation | 705 |
|
|||
Injection Complex VEPP-5 was turned into operation in the end of 2015 in the Budker Institute of Nuclear Physics (Novosibirsk, Russia). The main task of the facility is production, acceleration and transportation of high intensity electron and positron beams for two BINP's colliders. Now, VEPP-5 successfully delivers electron and positron beams to the collider VEPP-2000 and ready to start operation with the acceleration complex VEPP-4M. Beam diagnostics issues are very important for VEPP-5 facility tuning during the operation. Longitudinal beam diagnostic based on synchrotron radiation in the VEPP-5 Damping Ring is presented in the article. Equipment operation principle, main measurement results and future prospects are presented in this paper. | |||
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | ||
THPSC085 | Present Status of VEPP-5 Injection Complex Control System | controls, software, network, operation | 730 |
|
|||
VEPP-5 injection complex is being put into operation as beam source of VEPP-2000 and VEPP-4 colliders at the end of 2016. Its control system is being upgraded in order to reliably work with beam users and increase its manageability computer infrastructure was reconsidered to provide high availability and flexibility through virtualization of control servers. The paper presents architecture and implementation of complex computer infrastructure. A control software set based on CXv4, EPICS and VCAS frameworks under operating system Linux deals with a set of CAN, CAMAC and Ethernet specialized hardware. The software and hardware architecture and implementation is described. | |||
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | ||