Title |
Other Keywords |
Page |
The Control System for LEP |
accelerator, ion, simulation, timing |
2142 |
|
|
Imagescope to Photodiode Beam-Profile Imaging System |
accelerator, beamline, coupling, emittance |
2201 |
- D.D. Chamberlin, J.S. Hollabaugh, C.J. Stump, Jr.
|
|
Energy Measurement Using a Resonator Based Time-of-Flight System |
accelerator, field, linac, timing |
2237 |
- R.C. Pardo, B. Clifft, K.W. Johnson, R.N. Lewis
|
|
The CERN SPS Low Beta Insertion Control System |
feedback, field, insertion, software |
2293 |
|
|
The Use of a Commercial Data Base Management System in the LAMPF Control System |
accelerator, instrumentation, maintenance, software |
2302 |
|
|
The Proton Storage Ring Control System |
accelerator, controls, instrumentation, software |
2305 |
- P. Clout, S. Bair, A. Conley, R. Ford, M. Fuka, N. Greene
|
|
Data Acquisition Software for the LAMPF Control System |
accelerator, instrumentation, software, timing |
2308 |
|
|
Application of Local Area Networks to Accelerator Control Systems at the Stanford Linear Accelerator |
accelerator, field, insertion, instrumentation |
2317 |
- J.D. Fox, E. Linstadt, R. Melen
|
|
A New-Control System for the SLAC Accelerator Klystrons for SLC |
accelerator, klystron, monitoring, timing |
2325 |
|
|
Applications of FASTBUS to Beam Diagnostics and Experiment Data Systems |
accelerator, coupling, diagnostics, instrumentation |
2328 |
|
|
An Interactive Alarm System for the CERN PS Accelerator Complex |
accelerator, ion, software, survey |
2337 |
|
|
Software System for the Operation of the TRISTAN-AR Power Supply |
acceleration, quadrupole, software, timing |
2926 |
- K. Endo, H. Aoki, K. Arimoto, H. Fukuma, A. Kabe, T. Kubo, H. Yamamoto
|
|
Digital Simulation for TRISTAN-AR Magnet Supply and Control System |
accumulation, feedback, positron, simulation |
2929 |
- T. Kubo, K. Endo, H. Fukuma, A. Kabe
|
|
The LBL Magnetic Measurements Data Acquisition System |
instrumentation, magnetic measurements, quadrupole, software |
3596 |
|
|