Author: Hu, K.H.
Paper Title Page
MOBLA01 The Role of Beam Diagnostics in the Rapid Commissioning of the TPS Booster and Storage Ring 1
 
  • P.C. Chiu, J. Chen, Y.-S. Cheng, K.T. Hsu, K.H. Hu, C. H. Huang, C.H. Kuo, D. Lee, C.Y. Liao, C.Y. Wu
    NSRRC, Hsinchu, Taiwan
 
  The TPS is a newly constructed 3-GeV third-generation synchrotron light source featuring ultra-high photon brightness with extremely low emittance. After some hardware improvement especially demagnetization of chamber are completed, the commissioning of the beam in the booster ring began on December 12 and attained 3-GeV energy on December 16. The storage ring obtained its first stored beam and delivered synchrotron light on December 31. This report summarizes the role of beam diagnostic for hardware improvement and parameter tuning during TPS successful commissioning.  
slides icon Slides MOBLA01 [17.486 MB]  
Export • reference for this paper to ※ BibTeX, ※ LaTeX, ※ Text, ※ RIS/RefMan, ※ EndNote (xml)  
 
MOPB053 The Beam Loss Monitoring System in Taiwan Photon Source 175
 
  • C. H. Huang, J. Chen, Y.-S. Cheng, P.C. Chiu, K.T. Hsu, K.H. Hu, D. Lee, C.Y. Wu
    NSRRC, Hsinchu, Taiwan
 
  Taiwan photon source (TPS) is a 3rd generation and 3 GeV synchrotron light source during beam commissioning in NSRRC. Several types of beam loss monitors (BLMs) such as PIN-photodiodes, scintillation detectors, cherenkov BLMs and RadFETs are installed in the storage ring to study the beam loss distribution and mechanism. The installation infrastructure, design of reader units and integrated graphic user interface will be described in this report. The primary experimental results will also be summary here.  
poster icon Poster MOPB053 [0.661 MB]  
Export • reference for this paper to ※ BibTeX, ※ LaTeX, ※ Text, ※ RIS/RefMan, ※ EndNote (xml)  
 
TUPB066 Preliminary Test of the Bunch-by-Bunch Transverse Feedback System for TPS Storage Ring 502
 
  • Y.-S. Cheng, P.C. Chiu, K.T. Hsu, S.Y. Hsu, H.P. Hsueh, K.H. Hu, C.Y. Liao
    NSRRC, Hsinchu, Taiwan
 
  Commissioning of the Taiwan Photon Source (TPS) is in progress and divided into two phases. The storage ring equips with two five-cell PETRA RF cavities and without insertion devices installed for Phase-I commission to confirm correctness of everything, to do preliminary vacuum clearing, and wait available of cryogenic system available. After finished the Phase I commissioning in March, 2015, installation of two superconducting RF cavities and 10 sets of insertion devices are ongoing. The commissioning is planned to start around in August. There is a prototype vertical stripline kicker installed in 2014. One horizontal stripline kicker and two vertical stripline kickers were installed in May. Commercial available feedback processor was selected for the feedback system integration. Preliminary feedback loop closed have been tested during Phase-I beam commissioning in early 2015 with prototype vertical kicker. Beam commissioning with new kickers is scheduled when beam stored in Phase-II beam commissioning which will started soon. Final check before beam test is under way.  
Export • reference for this paper to ※ BibTeX, ※ LaTeX, ※ Text, ※ RIS/RefMan, ※ EndNote (xml)  
 
TUPB067 Synchrotron Radiation Measurement at Taiwan Photon Source 507
 
  • C.Y. Liao, Y.-S. Cheng, P.C. Chiu, K.T. Hsu, S.Y. Hsu, H.P. Hsueh, K.H. Hu, C.K. Kuan, C.Y. Wu
    NSRRC, Hsinchu, Taiwan
 
  The synchrotron radiation light produced from a dipole magnet is widely used to characterize beam parameters in synchrotron light source (photon synchrotron). The synchrotron radiation monitor (SRM) systems were implemented for the booster synchrotron and the storage ring at Taiwan Photon Source (TPS). The beam parameters of the booster were recorded during the energy ramping process through the CCD camera and streak camera. The beam size measurement and beam behavior observed of the storage ring were performed by X-ray pinhole camera and streak camera respectability. The results are summarized in this report.  
Export • reference for this paper to ※ BibTeX, ※ LaTeX, ※ Text, ※ RIS/RefMan, ※ EndNote (xml)  
 
TUPB068 Commissioning of BPM System for the TPS Project 512
 
  • P.C. Chiu, Y.-S. Cheng, K.T. Hsu, K.H. Hu, C. H. Huang, C.H. Kuo, D. Lee
    NSRRC, Hsinchu, Taiwan
 
  Beam position monitor system for TPS (Taiwan Photon Source) project include several different kinds of button BPMs distributed at transfer line and booster synchrotron booster, and the storage ring. All BPM equip with commercial Libera single-pass BPM electronics and Libera Brilliance+ BPM electronics. Commissioning of the TPS accelerator system start in late 2014 for phase I commissioning until the first quarter of 2015. Phase II commissioning equip with SRF and insertion devices is schedule in the 3rd and 4th quarter of 2015. System integration, software supports, tools available for commissioning, functionality and performance of BPM system will be summary in this reports.  
Export • reference for this paper to ※ BibTeX, ※ LaTeX, ※ Text, ※ RIS/RefMan, ※ EndNote (xml)