A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   Q   R   S   T   U   V   W   X   Y   Z    

Decking, W.

  
Paper Title Page
MOPLT044 Longitudinal Positron Polarisation in HERA-II 644
 
  • E. Gianfelice-Wendt, D.P. Barber, F. Brinker, W. Decking, J. Keil, M. Vogt, F.J. Willeke
    DESY, Hamburg
 
  Following the installation of two more pairs of spin rotators in the course of the HERA Luminosity Upgrade, longitudinal positron spin polarisation has now been generated simultaneously at all three positron(electron) interaction points in HERA at the routine energy of 27.5 GeV. The maximum attained so far is 54 percent. The theoretical maximum for this configuration and in the presence of realistic errors is 57.0 percent. This is the first time in the history of high energy electron storage ring physics that the naturally occurring vertical polarisation has been, with the aid of spin rotators, converted to longitudinal polarisation at three interaction points simultaneously. We describe the measures needed to attain polarisation in light of the HERA Upgrade and the resulting recent performance.  
TUPLT036 Optimization of Low Emittance Lattices for PETRA III 1225
 
  • W. Decking, K. Balewski
    DESY, Hamburg
 
  The reconstruction of the existing 2.3 km long storage ring PETRA II into a 3rd generation synchrotron light source (PETRA III) calls for an horizontal emittance of 1 nm rad. In addition the on- and off-momentum dynamic acceptance should be large to ensure sufficient injection efficiency and beam lifetime. We present three different types of lattices for the arcs of PETRA: a so-called TME lattice and a FODO lattice which both are newly designed to reach the specified emittance and the present FODO lattice with damping wigglers. The different lattice types have been compared through tracking calculations, including wiggler nonlinearities. Only the relaxed FODO lattice with damping wigglers meets the acceptance goals.  
TUPLT037 Dispersion Correction in HERA 1228
 
  • J. Keil, W. Decking
    DESY, Hamburg
 
  The electron-proton collider HERA at the DESY laboratory in Hamburg has been in operation since 1991. After the luminosity upgrade of HERA in 2001 the control of the horizontal and vertical dispersion function of the positron beam became more important than before. Deviations from the design dispersion in the horizontal plane can change the emittance of the electron beam significantly thus leading to a reduction of the luminosity. For optimizing the polarization of the electron beam the reduction of vertical orbit and dispersion deviations is important. In this paper the combined dispersion and orbit correction in HERA is described and first results are reported.  
TUPLT038 Closed Orbit Correction and Orbit Stabilisation Scheme for the 6 GEV Synchrotron Light Source PETRA III 1231
 
  • G.K. Sahoo, K. Balewski, W. Decking, Y.L. Li
    DESY, Hamburg
 
  PETRA III is a 6 GeV synchrotron light source being reconstructed out of the existing storage ring PETRA II. It will have a horizontal beam emittance of 1nm.rad and a 1% emittance ratio. Since the vertical beam sizes are ~5?10 micron in the low gap undulators sections the beam position stability requirement in the vertical plane is between 0.5 and 1 micron whereas the stability requirement in the horizontal plane is more relaxed. In this paper determination of golden orbit in the presence of magnetic field errors and magnet misalignments and correction of vertical spurious dispersion is discussed. A scheme of slow and fast orbit correction using the SVD algorithm has been developed. The distribution of monitors and the location of slow and fast correctors are reported. Estimations of the parameters of the fast orbit feedback have been derived from present measurements on PETRA II.  
WEPLT066 Beam Dynamics Study for PETRA III Including Damping Wigglers 1996
 
  • Y.L. Li, K. Balewski, W. Decking
    DESY, Hamburg
 
  Damping wigglers will be installed in the storage ring PETRA III to control the beam emittance to 1 nmrad. These wigglers will produce linear and nonlinear perturbations on beam dynamics. A new expanded transport matrix method is developed to solve linear dynamics, and used to match linear lattice functions. The symplectic method is adopted to track particle through the whole ring including the damping wigglers. Halbach?s formulae are used to describe the wiggler field. The main parameters of the wigglers are derived from field calculations. In order to avoid dangerous resonances, tune scanning is implemented to find suitable working points. According to presently known field quality, the nonlinear effects of damping wigglers will not degrade the performance of PETRA III and the dynamic aperture is still larger than the physical aperture.  
THOACH01 SPEAR3 Commissioning 216
 
  • J.A. Safranek, S. Allison, P. Bellomo, W.J. Corbett, M. Cornacchia, E. Guerra, R.O. Hettel, D. Keeley, N. Kurita, D.J. Martin, P.A. McIntosh, H. Morales, G.J. Portmann, F.S. Rafael, H. Rarback, J.J. Sebek, T. Straumann, A. Terebilo, J. Wachter, C. Wermelskirchen, M. Widmeyer, R. Yotam
    SLAC/SSRL, Menlo Park, California
  • M.J. Boland, Y.E. Tan
    ASP, Melbourne
  • J.M. Byrd, D. Robin, T. Scarvie, C. Steier
    LBNL/ALS, Berkeley, California
  • M. Böge
    PSI, Villigen
  • H.-P. Chang, C.-C. Kuo, H.-J. Tsai
    NSRRC, Hsinchu
  • W. Decking
    DESY, Hamburg
  • M.G. Fedurin, P. Jines
    LSU/CAMD, Baton Rouge, Louisiana
  • K. Harkay, V. Sajaev
    ANL/APS, Argonne, Illinois
  • S. Krinsky, B. Podobedov
    BNL/NSLS, Upton, Long Island, New York
  • L.S. Nadolski
    SOLEIL, Gif-sur-Yvette
  • A. Ropert
    ESRF, Grenoble
  • M. Yoon
    POSTECH, Pohang, Kyungbuk
 
  Starting in April, 2003, the SPEAR2 storage ring was removed and replaced with a new 500 mA, 3 GeV light source, SPEAR3. The SPEAR2 storage ring had been in use for high energy physics, then synchrotron radiation since 1972. Commissioning of SPEAR3 started on December 8, 2003 and synchrotron radiation will be delivered to the first users on March 8, 2004. SPEAR3 commissioning will be reviewed, including discussion of diagnostics, orbit control, optics correction and high current studies.  
Video of talk
Transparencies
THPKF019 PETRA III: A New High Brilliance Synchrotron Radiation Source at DESY 2299
 
  • K. Balewski, W. Brefeld, W. Decking, Y.L. Li, G.K. Sahoo, R. Wanzenberg
    DESY, Hamburg
 
  DESY has decided to rebuild its 2304 m long accelerator PETRA II into a dedicated light source called PETRA III. The reconstruction is planned to start mid of 2007.The new light source will operate at an energy of 6 GeV, a current of 100 mA, a horizontal emittance of 1 nmrad and an emittance coupling of 1%. In the first phase thirteen insertion devices are foreseen. In this paper the principle layout of the machine will be presented. The structure of the new machine combines properties of conventional storage rings and light sources and is therefore quite unconventional. One of the major challenges of the project is to achieve the small emittances. The basic idea is to use so called damping wigglers with a total length of 80 m to reduce the horizontal emittance to the desired level. To obtain and maintain the small emittances imposes tight tolerances on spurious dispersion and orbit quality and stability. These limits will be given and discussed.