A  B  C  D  E  F  G  H  I  J  K  L  M  N  O  P  Q  R  S  T  U  V  W  X  Y  Z  

Sha P.

PaperTitlePage
TUP09High Power Conditioning of the Input Coupler for BEPCII Superconductor Cavity122
 
  • W. M. Pan, G. W. Wang, Y. Sun, Z. Q. Li, H. Y. Lin, B. Xu, Q. Ma, T. M. Huang, P. Sha
    IHEP, CAS
 
 High power conditioning and RF processing of the input coupler for BEPCII superconductor cavity (SCC) has been performed. Gas desorption is very important for a new input coupler; and high power conditioning and electron bombardment is quite effective for outgasing. For this reason, the DC bias voltage is applied to the conductors of coupler in the room temperature conditioning. RF power with full reflection of 150kW has been arrived under +(-)2000V DC bias voltage during the room temperature conditioning. At the same time, other methods have also been studied to improve the performance of input coupler during the beam operation. Up to now, the input coupler works well under the beam current of 250mA and beam energy is 2.5Gev, which means the input coupler can feed 100kW RF power to beam in continuous wave in normal operation. The details about the high power conditioning and RF processing of the input coupler will be given in the paper. 
WEP44The construction of the RF system of BEPC II584
 
  • G. W. Wang, W. M. Pan, Y. Sun, Z. Q. Li, G. Y. Zhao, H. Y. Lin, Y. F. Xu, H. Huang, Q. Ma, B. Xu, Q. Y. Wang, Y. P. Liu, P. Sha, T. M. Huang, R. Liu, R. H. Zeng
    IHEP, CAS
  • T. Furuya, S. Mitsunobu, K. Akai
    KEK
 
 In this article, we'll introduce the RF system of BEPCII to readers. It consists of 4 subsystems: superconducting cavity, high power klystron, cryogenic system and LLRF. The construction of the RF system had been finished in late 2006. During the last year of running till now, it has performed very well.