| Beam Loss Monitoring and Control | 109 | ||
| K. Wittenburg, DESY, Hamburg | |||
| PAPER - SLIDES | |||
| Problems of Installation of Vibrating Wire Scanners into Accelerator Vacuum Chamber | 1837 | ||
| S. Arutunian, A. Avetisyan, N. Dobrovolski, M. Mayilyan, I. Vasiniuk, YerPhI, Yerevan; K. Wittenburg, DESY, Hamburg; R. Reetz, HTM Reetz GmbH, Berlin | |||
| PAPER | |||
| R&D Towards a Laser Based Beam Size Monitor for the Future Linear Collider | 1912 | ||
| T. Kamps, G.A. Blair, F. Poirier, RHUL, Egham; H. Lewin, S. Schreiber, N. Walker, K. Wittenburg, DESY, Hamburg | |||
| PAPER | |||
| Cryogenic Current Comparator for Absolute Measurements of the Dark Current of Superconducting Cavities for TESLA | 1915 | ||
| K. Knaack, M. Wendt, K. Wittenburg, DESY, Hamburg; R. Neubert, W. Vodel, FSU, Jena; A. Peters, GSI, Darmstadt | |||
| PAPER | |||
| Expansion of the Fast Linac Protection System for High Duty Cycle Operation at the TESLA Test Facility | 1966 | ||
| H. Schlarb, D. Pugachov, M. Staack, K. Wittenburg, DESY, Hamburg; Y. Cernousko, A. Ivanov, I. Krouptchenkov, S. Makonin, IHEP, Protvino, Moscow Region; V. Gorbunov, V. Greschko, INR, Moscow | |||
| PAPER | |||