Paper | Title | Other Keywords | Page |
---|---|---|---|
MOPTY021 | Measurement of Clock Jitter in Beam Diagnostic System | simulation, diagnostics, extraction, injection | 981 |
|
|||
Low clock jitter can improve the performance of beam diagnostic system. This paper presents a procedure for the direct measurement of low-level clock jitter. High resolution spectrum analyzer or broadband high sampling rate oscilloscope is not demanded by using this method. Simulation will be introduced. | |||
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2015-MOPTY021 | ||
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | ||
THPF012 | Status of the High Energy Beam Transport System for FAIR | vacuum, dipole, quadrupole, diagnostics | 3705 |
|
|||
The overall layout of the High Energy Beam Transport (HEBT) System of the Facility for Antiproton and Ion Research (FAIR)* did not change since its last presentation in 2008**. All necessitated adaptions as for example due to the introduction of the Modularized Start Version (MSV, module 0-3) of FAIR*** could be smoothly implemented. In the meanwhile the HEBT system is in its realisation phase with the procurement of its main components in progress. In the following adaptions of the system layout not yet covered in ** are summarized and an overview of the technical system design and procurement status are presented.
* FAIR Baseline Technical Report (FBTR), GSI 2006 ** S. Ratschow et al., Proc. of EPAC08, THPP104, Genoa, Italy (2008) ***FAIR Green Paper - The Modularized Start Version, October 2009 |
|||
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2015-THPF012 | ||
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | ||