MOBLA01 |
The Role of Beam Diagnostics in the Rapid Commissioning of the TPS Booster and Storage Ring |
1 |
|
- P.C. Chiu, J. Chen, Y.-S. Cheng, K.T. Hsu, K.H. Hu, C. H. Huang, C.H. Kuo, D. Lee, C.Y. Liao, C.Y. Wu
NSRRC, Hsinchu, Taiwan
|
|
|
The TPS is a newly constructed 3-GeV third-generation synchrotron light source featuring ultra-high photon brightness with extremely low emittance. After some hardware improvement especially demagnetization of chamber are completed, the commissioning of the beam in the booster ring began on December 12 and attained 3-GeV energy on December 16. The storage ring obtained its first stored beam and delivered synchrotron light on December 31. This report summarizes the role of beam diagnostic for hardware improvement and parameter tuning during TPS successful commissioning.
|
|
|
Slides MOBLA01 [17.486 MB]
|
|
Export • |
reference for this paper to
※ BibTeX,
※ LaTeX,
※ Text,
※ RIS/RefMan,
※ EndNote (xml)
|
|
|
MOPB053 |
The Beam Loss Monitoring System in Taiwan Photon Source |
175 |
|
- C. H. Huang, J. Chen, Y.-S. Cheng, P.C. Chiu, K.T. Hsu, K.H. Hu, D. Lee, C.Y. Wu
NSRRC, Hsinchu, Taiwan
|
|
|
Taiwan photon source (TPS) is a 3rd generation and 3 GeV synchrotron light source during beam commissioning in NSRRC. Several types of beam loss monitors (BLMs) such as PIN-photodiodes, scintillation detectors, cherenkov BLMs and RadFETs are installed in the storage ring to study the beam loss distribution and mechanism. The installation infrastructure, design of reader units and integrated graphic user interface will be described in this report. The primary experimental results will also be summary here.
|
|
|
Poster MOPB053 [0.661 MB]
|
|
Export • |
reference for this paper to
※ BibTeX,
※ LaTeX,
※ Text,
※ RIS/RefMan,
※ EndNote (xml)
|
|
|
TUPB068 |
Commissioning of BPM System for the TPS Project |
512 |
|
- P.C. Chiu, Y.-S. Cheng, K.T. Hsu, K.H. Hu, C. H. Huang, C.H. Kuo, D. Lee
NSRRC, Hsinchu, Taiwan
|
|
|
Beam position monitor system for TPS (Taiwan Photon Source) project include several different kinds of button BPMs distributed at transfer line and booster synchrotron booster, and the storage ring. All BPM equip with commercial Libera single-pass BPM electronics and Libera Brilliance+ BPM electronics. Commissioning of the TPS accelerator system start in late 2014 for phase I commissioning until the first quarter of 2015. Phase II commissioning equip with SRF and insertion devices is schedule in the 3rd and 4th quarter of 2015. System integration, software supports, tools available for commissioning, functionality and performance of BPM system will be summary in this reports.
|
|
Export • |
reference for this paper to
※ BibTeX,
※ LaTeX,
※ Text,
※ RIS/RefMan,
※ EndNote (xml)
|
|
|