A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   Q   R   S   T   U   V   W   X   Y   Z  

Wendt, M.

Paper Title Page
WGF02 Beam Instrumentation for Future High Intense Hadron Accelerator at Fermilab 440
 
  • M. Wendt, M. Hu, V.E. Scarpine, S. Shin, G. R. Tassotto, R. Thurman-Keup, J.R. Zagel
    Fermilab, Batavia, Illinois
 
 

High intense hadron beams of > 2 MW beam power are a key element for the new proposed Neutrino experiments at Fermilab. Therefore a new beam facility, called Project-X, is under discussion. We will present requirements, and first conceptual ideas for beam instrumentation and diagnostics, and the related R&D initiatives taking place in the high intense test accelerators, currently under construction. First results of beam profile measurements using OTR screens and laser wires are shown.

 

slides icon

Slides

 
CPL06 Closing Plenary Summary of Working Group F: Diagnostics and Instrumentation for High-Intensity Beams 496
 
  • M. Wendt
    Fermilab, Batavia, Illinois
  • T. Toyama
    KEK, Ibaraki
 
 

Working group F was charged with presentations and discussions on diagnostics and instrumentation of highintensity beams. We had 3 sessions spanning a total time of 330 minutes, in which 13 talks were presented. The presentation time for each talk had to be limited to 15-20 min., in order to allow sufficient time (5-10 min.) for some discussion. This turned out quite well, even though some presentations went longer, not every topic required the anticipated discussion time.
A final discussion session of 110 minutes was held as joint session with working group D (operations).

 

slides icon

Slides