MOPMB089 Installation of LCLS-II Cryomodules cryomodule, vacuum, cavity, MMI 324
 
  • D.A. White, S. Aderhold, R. Coy, D. Gonnella
    SLAC, Menlo Park, California, USA
 
  Funding: U.S. Department of Energy
The Linac Coherent Light Source II (LCLS-II) super-conducting accelerator is fully installed and operational. Cryomodules were designed and manufactured by Fermi National Accelerator Laboratory (FNAL) and Thomas Jefferson National Laboratory (JLab) during 2017-2020. From November 2018 through March 2021, SLAC Na-tional Accelerator Laboratory installed 37 Cryomodules. Full system cooldown was completed in March 2022. Installation processes were optimized at SLAC for best quality, especially during particle-free and UHV assem-bly. These processes and successful Cavity and Cry-omodule manufacturing resulted in installed gradient exceeding design requirements by more than 20%. No statistical variation in field emission onsets or magni-tudes were observed between manufacturing and site testing. This paper summarizes SLAC experience during installation, and relevant testing results.
 
DOI • reference for this paper ※ doi:10.18429/JACoW-SRF2023-MOPMB089  
About • Received ※ 20 June 2023 — Revised ※ 28 June 2023 — Accepted ※ 29 June 2023 — Issue date ※ 15 July 2023
Cite • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)