MOPMB033 | Efforts to Suppress Field Emission in SRF Cavities at KEK | cavity, SRF, laser, site | 167 |
|
|||
Our main objective is to achieve as high as possible quality factors Q₀ and maximal accelerating voltages Eacc within 1.3 GHz superconducting radio frequency (SRF) cavities. Beside an adequate surface treatment, key to achieve good performance is a proper assembly in the clean room prior cavity testing or operation. In this contribution we present the methods and results of our efforts to get a better understanding of our clean room environment and the particulate generation caused during the assembly work. Furthermore, we present the measures taken to suppress filed emission, followed by an analysis of vertical test results of the last six years. | |||
![]() |
Poster MOPMB033 [1.532 MB] | ||
DOI • | reference for this paper ※ doi:10.18429/JACoW-SRF2023-MOPMB033 | ||
About • | Received ※ 14 June 2023 — Revised ※ 25 June 2023 — Accepted ※ 02 September 2023 — Issue date ※ 02 September 2023 | ||
Cite • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | ||
TUPTB036 | Equidistant Optimization of Elliptical SRF Standing Wave Cavities | cavity, SRF, ECR, linac | 480 |
|
|||
A record accelerating rate was achieved earlier in standing wave (SW) SRF cavities when their shape was optimized for lower peak surface magnetic field. In view of new materials with higher limiting magnetic fields, expected for SRF cavities, in the first line Nb₃Sn, the approach to optimization of cavity shape should be revised. A method of equidistant optimization, offered earlier for traveling wave cavities is applied to SW cavities. It is shown here that without limitation by magnetic field, the maximal accelerating rate is defined to a significant degree by the cavity shape. For example, for a cavity with the aperture radius Ra = 35 mm the minimal ratio of the peak surface electric field to the accelerating rate is about Epk/Eacc = 1.54. So, with the maximal surface field experimentally achieved Epk ¿ 125 MV/m, the maximal achievable accelerating rate is about 80 MeV/m even if there are no restrictions by the magnetic field. Another opportunity ¿ optimization for a low magnetic field, is opening for the same material, Nb₃Sn, with the purpose to have a high quality factor and increased accelerating rate that can be used for industrial linacs. | |||
![]() |
Poster TUPTB036 [0.787 MB] | ||
DOI • | reference for this paper ※ doi:10.18429/JACoW-SRF2023-TUPTB036 | ||
About • | Received ※ 15 June 2023 — Revised ※ 24 June 2023 — Accepted ※ 26 June 2023 — Issue date ※ 08 July 2023 | ||
Cite • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | ||
WEPWB070 | Test Shipment of the PIP-II 650 MHz Transport Frame Between FNAL to STFC-UKRI | cryomodule, ISOL, linac, SRF | 750 |
|
|||
Funding: Work supported by Fermi Research Alliance, LLC under Contract No. DEAC02- 07CH11359 with the United States Department of Energy The PIP-II Project will receive fully assembled cryomodules from CEA and STFC-UKRI as in-kind contributions. Damage to these cryomodules during transport is understood to be a significant risk to the project, so an extensive testing and validation program is in process to mitigate this risk. The centerpiece of this effort is the eventual shipment from FNAL to STFC-UKRI and back of a prototype HB650 cryomodule with cold testing before and after shipment to verify no functionality changes from shipment. Most recently, a test shipment to the UK and back using a cryomodule analog was completed using realistic logistics, handling, instrumentation, and planning. The process of executing this test shipment, lessons learned, and plan moving forward will be presented here. |
|||
DOI • | reference for this paper ※ doi:10.18429/JACoW-SRF2023-WEPWB070 | ||
About • | Received ※ 18 June 2023 — Revised ※ 27 June 2023 — Accepted ※ 28 June 2023 — Issue date ※ 17 July 2023 | ||
Cite • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | ||
WEPWB085 | Degradation and Recovery of Cavity Performance in SRILAC Cryomodules at RIBF | cavity, operation, vacuum, SRF | 784 |
|
|||
The RIKEN superconducting (SC) heavy-ion linear accelerator (SRILAC) has been providing beam supply for super-heavy elements synthesis experiments since its commissioning in January 2020. However, the long-term operation of SC radio-frequency (RF) cavities leads an increase in the X-ray levels caused by field emissions resulting from changes in the inner surface conditions. More than half of the ten SC 1/4 wavelength resonators (SC-QWRs) of SRILAC, operating at a frequency of 73 MHz, have experienced an increase in X-ray levels, thus, requiring adjustments to the acceleration voltage for continuous operation. While several conditioning methods have been employed for SC cavities, a fully established technique is yet to be determined. To address this situation, a relatively simple conditioning method was implemented at RIKEN. The proposed method uses high-voltage pulsed power and imposes a low load on the cavities. | |||
![]() |
Poster WEPWB085 [12.789 MB] | ||
DOI • | reference for this paper ※ doi:10.18429/JACoW-SRF2023-WEPWB085 | ||
About • | Received ※ 13 June 2023 — Revised ※ 26 June 2023 — Accepted ※ 27 June 2023 — Issue date ※ 01 July 2023 | ||
Cite • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | ||