Paper | Title | Page |
---|---|---|
MONP03 |
3.5 Tesla 49-pole Superconducting Wiggler for DLS
Budker Institute of Nuclear Physics, Novosibirsk, Russia
3.5 Tesla 49-pole superconducting wiggler with 16 mm magnetic gap and 60 mm period for Diamond Light Source (England) has been fabricated in Budker INP. A first wiggler test was carried out in bath cryostat in BINP on July 2005. The first wiggler test in own cryostat was performed in BINP on January 2006. This test includes field integrals measurements with stretched wire method and field measurements with hall probe. All this measurements was repeated on April 2006 in DLS. Design of special magnetic measurement system with anti-chamber and main wiggler tests results are presented in this paper. |
398 |
MONP06
|
The Main Test Results Of The 3.5 Tesla 49-Pole Superconducting Wiggler for DLS
BINP, Novosibirsk, Russia
3.5 Tesla 49-pole superconducting wiggler with 16 mm magnetic gap and 60 mm period for Diamond Light Source (England) has been fabricated in Budker INP. A first wiggler test was carried out in bath cryostat in BINP on July 2005. The first wiggler test in own cryostat was performed in BINP on January 2006. This test includes field integrals measurements with stretched wire method and field measurements with hall probe. All this measurements were repeated on April 2006 in DLS. Design of special magnetic measurement system with anti-chamber and main wiggler tests results are presented in this paper. |
404 |