PAC1991 Authors
A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   Q   R   S   T   U   V   W   X   Y   Z  

Author: Mattison, T.

Title Page
The Proposed Injection System for an Asymmetric B Factory in the PEP Tunnel 982
  • E. Bloom, W. Barletta, F. Bulos, G. Loew, T. Mattison, R. Miller, B. Sukiennicki
 
SLC Kicker Magnet Limitations 996
  • R. Cassel, G. Bowden, F. Bulos, A. Donaldson, D. Fiander, T. Mattison, J. Weaver
 
Operational Experience with SLC Damping Ring Kicker Magnets 2331
  • T. Mattison, R. Cassel, A. Donaldson, G. Gross, A. Harvey
 
Development of Epoxy Potting for High Voltage Insulation at SLAC 2334
  • G. Gross, R. Cassel, T. Mattison
 
Status of the SLC Damping Ring Kicker Systems 2955
  • T. Mattison, R. Cassel, A. Donaldson, D. Gough, G. Gross, A. Harvey, D. Hutchinson, M. Nguyen
 
Pulse Shape Adjustment for the SLC Damping Ring Kickers 3156
  • T. Mattison, R. Cassel, A. Donaldson, H. Fischer, D. Gough
 
High Voltage Pulse Cable and Connector Experience in the Kicker Systems at SLAC 3159
  • K. Harris, M. Artusy, A. Donaldson, T. Mattison
 
Kicker Prepulse Canceler 3162
  • R. Cassel, T. Mattison