Title |
Page |
The Proposed Injection System for an Asymmetric B Factory in the PEP Tunnel |
982 |
- E. Bloom, W. Barletta, F. Bulos, G. Loew, T. Mattison, R. Miller, B. Sukiennicki
|
|
SLC Kicker Magnet Limitations |
996 |
- R. Cassel, G. Bowden, F. Bulos, A. Donaldson, D. Fiander, T. Mattison, J. Weaver
|
|
Operational Experience with SLC Damping Ring Kicker Magnets |
2331 |
- T. Mattison, R. Cassel, A. Donaldson, G. Gross, A. Harvey
|
|
Development of Epoxy Potting for High Voltage Insulation at SLAC |
2334 |
- G. Gross, R. Cassel, T. Mattison
|
|
Status of the SLC Damping Ring Kicker Systems |
2955 |
- T. Mattison, R. Cassel, A. Donaldson, D. Gough, G. Gross, A. Harvey, D. Hutchinson, M. Nguyen
|
|
Pulse Shape Adjustment for the SLC Damping Ring Kickers |
3156 |
- T. Mattison, R. Cassel, A. Donaldson, H. Fischer, D. Gough
|
|
High Voltage Pulse Cable and Connector Experience in the Kicker Systems at SLAC |
3159 |
- K. Harris, M. Artusy, A. Donaldson, T. Mattison
|
|
Kicker Prepulse Canceler |
3162 |
|
|