PAC1987 Keywords
A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   Q   R   S   T   U   V   W   X   Y   Z  

Keyword: commissioning

Title Other Keywords Page
First Experience with the LEP Pre-Injector (LPI) by the LPI Beam Commissioning Team accumulation, electron, injection, linac 298
  • J.H.B. Madsen, S. Battisti, D. Blechschmidt, J.C. Bourdon, P. Brunet, J.P. Delahaye, B. Frammery, K. Hübner, A. Krusche, H. Kugler, A. Poncet, J.P. Potier, A. Riche, D.J. Warner
 
Prototype Development of a Beam Line Expert System accelerator, alignment, simulation, software 532
  • S.H. Clearwater, M.J. Lee
 
Experience in Using Workstations as Hosts in an Accelerator Control Environment accelerator, controls, ion, software 594
  • A. Abola, R. Casella, T. Clifford, L. Hoff, R. Katz, S. Kennell, S. Mandell, E. McBreen, D.P. Weygand
 
Experience with the Use of "Macintrotte" for Commissioning Process Equipment of the LEP Pre-Injector CAMAC, instrumentation, klystron, software 597
  • F. Di Maio, W. Heinze, F. Perriollat
 
Error-Finding and Error-Correcting Methods for the Start-Up of the SLC accelerator, alignment, quadrupole, simulation 1334
  • M.J. Lee, S.H. Clearwater, S.D. Kleban, L.J. Selig
 
Analysis of Orbit Perturbations of the SLC Arcs accelerator, collider, damping, emittance 1361
  • W.T. Weng, A. Chao, J. Murray