Title |
Other Keywords |
Page |
500 kV Mercury Accelerator |
accelerator, coupling, ion, vacuum |
3039 |
- J. Brodowski, J.T. Keane, A.W. Maschke, E. Meier, R.M. Mobley
|
|
Plans for the LEP Control System |
acceleration, monitoring, software, timing |
3182 |
- R. Keyser, J.P. Koutchouk, C.R.C.B. Parker, J. Pett, P. Wolstenholme
|
|
The Improvement Project for the CPS Controls |
CAMAC, accelerator, maintenance, software |
3272 |
- G. Baribaud, S. Battisti, J.P. Benincasa, J. Boillot, M. Boutheon, R. Calliau, B. Carpenter, J. Cuperus, G. Daems, A. Daneels, R. Debordes, P. Heymans, I. Kamber, H. Kugler, B. Kuiper, F. Perriollat, J.P. Potier, W. Remmer, C. Serre, P. Skarek, A. Van Der Schueren
|
|
The CESR Control System |
accelerator, linac, software, synchrotron |
3275 |
- R. Littauer, S.E. Ball, R.G. Helmke, S.B. Peck, D.H. Rice
|
|
Control System for the Holifield Heavy Ion Research Facility Beam Buncher |
accelerator, bunching, ion, monitoring |
3304 |
|
|
Interface Hardware for CESR Control System |
CAMAC, ferrite, impedance, synchrotron |
3307 |
- R.G. Helmke, S.E. Ball, D.H. Rice
|
|
The Microprocessor-Based Control Facility of the He Refrigerator System used in the 1000 GeV Fermilab Switchyard |
accelerator, field, software, timing |
3316 |
- A.F. Tummillo, R.A. Andrews, J. McCarthy, E.R. Oetting
|
|
Integration of Existing Dissimilar Power Supply Controls into a Standardized Equipment-Orientated Control System |
accelerator, algorithms, maintenance, software |
3319 |
- E. Asseo, G. Baribaud, M. Bouthéon, I. Kamber, H. Kugler, F. Völker
|
|
Monitor 1979 |
cooling water, radiation, target, vacuum |
3376 |
- D.L. Grisham, E.L. Ekberg, J.E. Lambert, R.E. Meyer, P.J. Stroik, M.D. Wickham
|
|
A Microprocessor Based Beam Intensity and Efficiency Display System for the Fermilab Accelerator |
accelerator, booster, software, timing |
3448 |
|
|
Power for the Fermilab Tevatron Helium Liquefier |
acceleration, accelerator, field, impedance |
3938 |
- J. Hoover, S. Orr, J. Ryk, A.T. Visser
|
|
Helium Refrigeration System and Cryogenic System for Superconducting Switchyard Magnets at Fermilab |
accelerator, halo, quench, thermal |
4093 |
- R.A. Andrews, J.A. Appel, R.L. Dixon, R.D. Kephart, J. King, R.J. Kolar, S.L. Lackey, J.D. McCarthy, R.D. Oberholtzer, E.R. Oetting, A.F. Tummillo
|
|