Paper | Title | Page |
---|---|---|
TUPAS028 | Upgrades to the Fermilab NuMI Beamline | 1712 |
|
||
Funding: Operated by Universities Research Association Inc. under Contract No. DE-AC02-76CH03000 with the United States Department of Energy. The NuMI beamline at Fermilab has been operational since the spring of 2005 delivering high-intensity neutrino beams to the MINOS experiment. A beam power on target of 310 kW has been achieved and a total of more than 2·1020 protons have been delivered to the NuMI target. Upgrades to NuMI are planned in preparation for the future MINERvA and NOvA neutrino experiments increasing the NuMI beam power capability from 400 kW to 700 kW and then as much as 1.2 MW. An overview of the future upgrade to NuMI is presented. |
||
TUOAKI01 | Status of the NuMI Neutrino Beam at Fermilab | 691 |
|
||
The NuMI beam at Fermilab produces a high-intensity neutrino beam for neutrino oscillation experiments. Since the start of 2005, NuMI has been delivering beam to the MINOS experiment. Greater than 2x10[20] 120 GeV protons have been delivered to the neutrino production target, with a peak power of 320 kW being achieved. This note reports on the status and operation of the beam and its technical components, including the target, horns, and instrumentation. | ||
|
Slides |