Paper |
Title |
Other Keywords |
Page |
THPH03 |
The XBPM Project at MAX IV Frontends, Overview and First Results |
storage-ring, shielding, controls, photon |
340 |
|
- A. Bartalesi
MAX IV Laboratory, Lund University, Lund, Sweden
|
|
|
All the frontends installed on the 3GeV storage ring at MAX IV are equipped with two X-Ray Beam Position Monitors. Having recently finished the installation of the acquisition system, it was possible to record and analyse data. This presentation describes the setup and shows the first results.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-MEDSI2018-THPH03
|
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|