Author: de Oliveira, H.G.P.
Paper Title Page
TUPH43 The LNLS Metrology Building - Environmental Control Results 143
 
  • H.G.P. de Oliveira, C.S.N.C. Bueno, L. Sanfelici, M.B. da Silva
    LNLS, Campinas, Brazil
 
  Funding: Ministry of Science, Technology, Innovation and Communication (MCTIC)
Modern synchrotron light sources require high mechanical stability throughout its facilities, frequently demanding characterization processes in theμand nanometer scales. In this context, the Brazilian Synchrotron Light Laboratory (LNLS) built a new facility with several controlled environment rooms to minimize disturbances during optical and mechanical metrology procedures and to support advanced instrumentation development for the new Sirius' beamlines. The building design imposed very strict requirements regarding temperature, humidity and particles. This work presents the environmental control validation results and the floor vibration assessment enlightening the influence of the building machinery. Temperature variations below ± 0,1 °C were successfully achieved for all rooms, relative humidity is also better than 50 ± 5 % and the floor RMS displacement did not exceed 15 nm. The building is fully operational since early 2017 and currently hosting several tests on monochromators, mirrors, front-ends and many other systems for the Sirius beamlines.
Metrology, environmental control, vibration assessment
 
poster icon Poster TUPH43 [2.557 MB]  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-MEDSI2018-TUPH43  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
WEPH39 Validation Results for Sirius APU19 Front End Prototype 290
 
  • H.G.P. de Oliveira, L.C. Arruda, C.S.N.C. Bueno, H.F. Canova, P.T. Fonseca, G.L.M.P. Rodrigues, L. Sanfelici, L.M. Volpe
    LNLS, Campinas, Brazil
 
  Funding: Ministry of Science, Technology, Innovation and Communication (MCTIC)
A Front End (FE) prototype for a 19-mm period length Adjustable Phase Undulator (APU19) beamline of the new Brazilian 4th-generation synchrotron, Sirius, was assembled in the LNLS metrology building in January 2017 to validate main design concepts. Regarding stability, flow-induced vibration (FIV) investigations were carried out on the water-cooled components, and modal analyses were made on the X-Ray Beam Position Monitor (XBPM) support. As for the vacuum system, final pressure levels were investigated and a vacuum breach was intentionally provoked to verify the performance of the equipment protection system (EPS). In addition, cycling tests of the Photon and Gamma shutters were conducted to verify the FE reliability. Moreover, the three-layer protection system, developed to limit the maximum aperture for the high-power slits, was functionally evaluated. Finally, the results were used to improve the FE to its final design. This paper describes the tests setups and results obtained during the validations.
 
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-MEDSI2018-WEPH39  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)