Paper | Title | Page |
---|---|---|
MO1P01 | Status of the SNS Proton Power Upgrade Project | 24 |
|
||
SNS plans to double the power capability of the SNS proton beam by increasing the beam energy and the beam current. Accelerator scope includes additional superconducting RF cryo-modules and supporting RF systems, and upgrades to existing RF systems. Also the accumulator storage ring and the neutron source target will be upgraded to accommodate the additional power. The technical approach, project status and plans will be discussed. | ||
Slides MO1P01 [6.457 MB] | ||
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-LINAC2018-MO1P01 | |
About • | paper received ※ 10 September 2018 paper accepted ※ 19 September 2018 issue date ※ 18 January 2019 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |