Paper |
Title |
Page |
MOPO037 |
SRF Gun Development at DESY |
105 |
MOOP07 |
|
|
- E. Vogel, S. Barbanotti, I. Hartl, K. Jensch, D. Klinke, D. Kostin, W.-D. Möller, M. Schmökel, J.K. Sekutowicz, S. Sievers, N. Steinhau-Kühl, A.A. Sulimov, J.H. Thie, H. Weise, L. Winkelmann, B. van der Horst
DESY, Hamburg, Germany
- J.A. Lorkiewicz, R. Nietubyć
NCBJ, Świerk/Otwock, Poland
- J. Smedley
BNL, Upton, Long Island, New York, USA
- J. Teichert
HZDR, Dresden, Germany
- M. Wiencek
IFJ-PAN, Kraków, Poland
|
|
|
A future upgrade of the European XFEL (E-XFEL) foresees an additional cw operation mode increasing the flexibility in the photon beam time structure. This mode requires among others a cw operating photo injector. We believe that using an SRF gun is the preferred approach as the beam parameters of normal conducting pulsed guns can be potentially met by SRF guns operating cw. Since more than a decade DESY in collaboration with TJNAF, NCBJ, BNL, HZB and HZDR performs R&D to develop an all superconducting RF gun with a lead cathode. In the frame of E-XFEL cw upgrade feasibility studies, the SRF-gun R&D program gained more attention and support. Within the next few years we would like to demonstrate the performance of the all superconducting injector required for the E-XFEL upgrade. The selected approach offers advantages w.r.t. the cleanliness of the superconducting surface, but requires a complete disassembly of a cryostat and stripping the gun cavity in a clean room to exchange the cathode. Thus it is practical only when the life time of the cathode is at least several months. In this paper we present the actual status of the R&D program, next steps and the longer term plans.
|
|
|
Slides MOPO037 [1.966 MB]
|
|
|
Poster MOPO037 [3.774 MB]
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-LINAC2018-MOPO037
|
|
About • |
paper received ※ 11 September 2018 paper accepted ※ 21 September 2018 issue date ※ 18 January 2019 |
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|
TUPO028 |
Retreatment of European XFEL Series Cavities at DESY as Part of the Repair of European XFEL Accelerating Modules |
384 |
|
- S. Sievers, N. Krupka, D. Reschke, S. Saegebarth, J. Schaffran, M. Schalwat, P. Schilling, M. Schmökel, N. Steinhau-Kühl, E. Vogel, H. Weise, B. van der Horst
DESY, Hamburg, Germany
- M. Wiencek
IFJ-PAN, Kraków, Poland
|
|
|
For the European XFEL 102 accelerating modules were built and tested. Several accelerating modules had to be reworked due to different kinds of non-conformities. The extent of this rework varied greatly. At the end of production four accelerating modules could not be qualified in time before the tunnel installation was to be finished in September 2016. Meanwhile the cavity strings of two of these accelerating modules have been disassembled in the DESY clean room. The cavities have been retreated at DESY either by additional high pressure water rinsing or BCP flash chemical treatment. All cavities were vertically tested and 15 out of 16 were qualified for the reassembly of the cavity strings. One accelerating module will be reassembled completely and tested until the end of 2018; the other will follow in the first half of 2019. We report on retreatment procedures and performance of these cavities.
|
|
|
Poster TUPO028 [1.662 MB]
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-LINAC2018-TUPO028
|
|
About • |
paper received ※ 11 September 2018 paper accepted ※ 21 September 2018 issue date ※ 18 January 2019 |
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|