Author: Schuett, M.
Paper Title Page
TUPO083 Beam Dynamics for the FAIR p-Linac Ladder RFQ 522
SPWR033   use link to see paper's listing under its alternate paper code  
 
  • M. Syha, U. Ratzinger, M. Schuett
    IAP, Frankfurt am Main, Germany
 
  After the successful measurements with a 0.8 m prototype a 3.3 m Ladder-RFQ is under construction at IAP, Goethe University Frankfurt. It is designed to accelerate protons from 95 keV to 3.0 MeV according to the design parameters of the p-Linac at FAIR. Along the acceleration section modulation parameter, aperture and synchronous phase all course (quasi-)linear, which differentiates this design approach from other designs developed at IAP. The ratio of transversal vane curvature radius to mid-cell radial aperture as well as the vane radius itself are constant, which favors a flat voltage distribution along the RFQ. This was verified by implantation of the modulated vane geometry into MWS-CST RF field simulations. The development of adequate beam dynamics was done in close collaboration with the IAP resonator design team. The Los Alamos RFQGen-code was used for the RFQ design and the beam dynamics simulations.  
poster icon Poster TUPO083 [0.932 MB]  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-LINAC2018-TUPO083  
About • paper received ※ 12 September 2018       paper accepted ※ 08 October 2018       issue date ※ 18 January 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
THPO046 Status of the FAIR Proton Linac 787
 
  • C.M. Kleffner, S. Appel, R. Berezov, J. Fils, P. Forck, M. Kaiser, K. Knie, C. Mühle, S. Puetz, A. Schnase, G. Schreiber, A. Seibel, T. Sieber, V. Srinivasan, J. Trüller, W. Vinzenz, C. Will
    GSI, Darmstadt, Germany
  • A. Almomani, H. Hähnel, U. Ratzinger, M. Schuett, M. Syha
    IAP, Frankfurt am Main, Germany
 
  As part of the accelerator chain for antiproton production of the FAIR facility, a special high-intensity short pulsed 325 MHz proton linac is being developed. The Proton linac is designed to deliver a beam current of 70 mA with an energy of 68 MeV. A 2.45 GHz ECR source designed for the generation of 100 mA beams with an energy of 95 keV is currently being tested at CEA/Saclay. The production of the structure of the IAP ladder RFQ is nearly completed. First parts of the RFQ vacuum chambers have been successfully copperplated at the GSI. Seven Thales Klystrons have been delivered to GSI at the beginning of 2018 and are nearly ready for use. The completion of the setup of the HV modulator is expected end of the year 2018. The state of procurement and development of further accelerator components will be presented.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-LINAC2018-THPO046  
About • paper received ※ 12 September 2018       paper accepted ※ 21 September 2018       issue date ※ 18 January 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
THPO060 First RF Measurements of the 325 MHz Ladder RFQ 826
 
  • M. Schuett, U. Ratzinger, M. Syha
    IAP, Frankfurt am Main, Germany
 
  Funding: BMBF 05P15RFRBA
Based on the positive results of the unmodulated 325 MHz Ladder-RFQ prototype from 2013 to 2016, we developed and designed a modulated 3.3 m Ladder-RFQ*. The unmodulated prototype Ladder-RFQ features a very constant voltage along the axis. The RFQ was high power tested at the GSI test stand. It accepted 3 times the RF power level needed in operation**. That level corresponds to a Kilpatrick factor of 3.1 with a pulse length of 200 µs. The 325 MHz RFQ is designed to accelerate protons from 95 keV to 3.0 MeV according to the design parameters of the proton linac within the FAIR project. This particular high frequency creates difficulties for a 4-ROD type RFQ, which triggered the development of a Ladder RFQ with its higher symmetry. The results of the unmodulated prototype have shown, that the Ladder-RFQ is a suitable candidate for that frequency. For the present design duty cycles are feasible up to 5%. The basic design and tendering of the RFQ has been successfully completed in 2016. Manufacturing will be completed in August 2018. We will show the the finalization of manufacturing as well as first low level RF measurements of the Ladder RFQ.
*Journal of Physics: Conf. Series 874 (2017) 012048
**Proceedings of LINAC2016, East Lansing, TUPLR053
 
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-LINAC2018-THPO060  
About • paper received ※ 12 September 2018       paper accepted ※ 20 September 2018       issue date ※ 18 January 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)