Author: Leyge, J.F.
Paper Title Page
TUPO095 Beam Loading with the First Rebuncher of Spiral2, First Measurements 546
 
  • M. Lechartier, R. Ferdinand, J.F. Leyge
    GANIL, Caen, France
 
  In the SPI2 project the middle energy line (LME) is equiped with a radio frequency qupole and three Rebunchers. The subject of this article is to measure and characterise the effect of the beam loading on the first Rebuncher cavity.  
poster icon Poster TUPO095 [1.146 MB]  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-LINAC2018-TUPO095  
About • paper received ※ 20 September 2018       paper accepted ※ 15 January 2019       issue date ※ 18 January 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)