Author: Ferdinand, R.
Paper Title Page
TUPO095 Beam Loading with the First Rebuncher of Spiral2, First Measurements 546
 
  • M. Lechartier, R. Ferdinand, J.F. Leyge
    GANIL, Caen, France
 
  In the SPI2 project the middle energy line (LME) is equiped with a radio frequency qupole and three Rebunchers. The subject of this article is to measure and characterise the effect of the beam loading on the first Rebuncher cavity.  
poster icon Poster TUPO095 [1.146 MB]  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-LINAC2018-TUPO095  
About • paper received ※ 20 September 2018       paper accepted ※ 15 January 2019       issue date ※ 18 January 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
THPO047 SPIRAL2 Injector Commissioning 790
THOP01   use link to see paper's listing under its alternate paper code  
 
  • R. Ferdinand, M. Di Giacomo, H. Franberg, O. Kamalou, J.-M. Lagniel, G. Normand, A. Savalle, F. Varenne
    GANIL, Caen, France
  • D. Uriot
    CEA/DRF/IRFU, Gif-sur-Yvette, France
 
  The SPIRAL2 injector is composed of two ion sources (p/d and heavy ions up to A/Q=3) followed by a 730 keV/u RFQ. Beam commissioning has started in 2014 in parallel with the superconducting linac and HEBT installations. The RFQ beam commissioning started soon after the first RF conditioning done in October 2015. This paper describes the RFQ beam measurements done on the diagnostic plate for the reference particles (H+, 4He2+ and recently 18O6+) and the difficulties encountered for the RFQ commissioning at the A/Q=3 field level.  
slides icon Slides THPO047 [7.846 MB]  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-LINAC2018-THPO047  
About • paper received ※ 11 September 2018       paper accepted ※ 20 September 2018       issue date ※ 18 January 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)