Paper |
Title |
Page |
TUPO095 |
Beam Loading with the First Rebuncher of Spiral2, First Measurements |
546 |
|
- M. Lechartier, R. Ferdinand, J.F. Leyge
GANIL, Caen, France
|
|
|
In the SPI2 project the middle energy line (LME) is equiped with a radio frequency qupole and three Rebunchers. The subject of this article is to measure and characterise the effect of the beam loading on the first Rebuncher cavity.
|
|
|
Poster TUPO095 [1.146 MB]
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-LINAC2018-TUPO095
|
|
About • |
paper received ※ 20 September 2018 paper accepted ※ 15 January 2019 issue date ※ 18 January 2019 |
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|
THPO047 |
SPIRAL2 Injector Commissioning |
790 |
THOP01 |
|
|
- R. Ferdinand, M. Di Giacomo, H. Franberg, O. Kamalou, J.-M. Lagniel, G. Normand, A. Savalle, F. Varenne
GANIL, Caen, France
- D. Uriot
CEA/DRF/IRFU, Gif-sur-Yvette, France
|
|
|
The SPIRAL2 injector is composed of two ion sources (p/d and heavy ions up to A/Q=3) followed by a 730 keV/u RFQ. Beam commissioning has started in 2014 in parallel with the superconducting linac and HEBT installations. The RFQ beam commissioning started soon after the first RF conditioning done in October 2015. This paper describes the RFQ beam measurements done on the diagnostic plate for the reference particles (H+, 4He2+ and recently 18O6+) and the difficulties encountered for the RFQ commissioning at the A/Q=3 field level.
|
|
|
Slides THPO047 [7.846 MB]
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-LINAC2018-THPO047
|
|
About • |
paper received ※ 11 September 2018 paper accepted ※ 20 September 2018 issue date ※ 18 January 2019 |
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|