Author: Connell, M. S.
Paper Title Page
MO1P01 Status of the SNS Proton Power Upgrade Project 24
 
  • J. Galambos, M.S. Champion, M.P. Howell, S.-H. Kim, J. Moss, M.A. Plum, B.W. Riemer, K.S. White
    ORNL, Oak Ridge, Tennessee, USA
  • M. S. Connell, R. W. Steffey
    ORNL RAD, Oak Ridge, Tennessee, USA
 
  SNS plans to dou­ble the power ca­pa­bil­ity of the SNS pro­ton beam by in­creas­ing the beam en­ergy and the beam cur­rent. Ac­cel­er­a­tor scope in­cludes ad­di­tional su­per­con­duct­ing RF cryo-mod­ules and sup­port­ing RF sys­tems, and up­grades to ex­ist­ing RF sys­tems. Also the ac­cu­mu­la­tor stor­age ring and the neu­tron source tar­get will be up­graded to ac­com­mo­date the ad­di­tional power. The tech­ni­cal ap­proach, pro­ject sta­tus and plans will be dis­cussed.  
slides icon Slides MO1P01 [6.457 MB]  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-LINAC2018-MO1P01  
About • paper received ※ 10 September 2018       paper accepted ※ 19 September 2018       issue date ※ 18 January 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)