Paper |
Title |
Page |
TU-27 |
Development of the B-Factory Linac 50-MW Pulse Klystron
|
427 |
|
- S. Fukuda, S. Anami, S. Michizono, K. Nakao, Y. Saito
KEK, Ibaraki, Japan
|
|
TU-39 |
High Power Tests of Pill-Box and TW-In-Ceramic Type S-Band RF Windows
|
457 |
|
- S. Michizono, H. Mizuno, Y. Saito
KEK, Ibaraki, Japan
- S.Yu. Kazakov
BINP, Protvino, Moscow Region, Russia
|
|
TU-43 |
RF High Power Tests of the X-Band Windows in the TWR
|
466 |
|
- H. Mizuno, S. Michizono, J. Odagiri, Y. Otake, S. Tokumoto, Y. Saito
KEK, Ibaraki, Japan
- S.Yu. Kazakov
BINP, Protvino, Moscow Region, Russia
|
|
TU-84 |
Pressure-Distribution Analysis of the Vacuum System for the KEKB Injector Linac
|
567 |
|
- K.W. Kakihara, A. Enomoto, G. Horikoshi, Y. Saito, I. Sato
KEK, Ibaraki, Japan
|
|