Author: Rybarcyk, L.
Paper Title Page
TUPAB205 Advancement of LANSCE Front End Accelerator Facility 1894
 
  • Y.K. Batygin, D. Gorelov, S.S. Kurennoy, J.W. Lewellen, N.A. Moody, L. Rybarcyk
    LANL, Los Alamos, New Mexico, USA
 
  Funding: Work supported by US DOE under contract 89233218CNA000001
The LAN­SCE ac­cel­er­a­tor started rou­tine op­er­a­tion in 1972 as a high-power fa­cil­ity for fun­da­men­tal re­search and na­tional se­cu­rity ap­pli­ca­tions. To re­duce long-term op­er­a­tional risk, we pro­pose to de­velop a new Front End of ac­cel­er­a­tor fa­cil­ity. It con­tains 100-keV in­jec­tor with 3-MeV RFQ, and 6-tanks Drift Tube Linac to ac­cel­er­ate par­ti­cles up to en­ergy of 100 MeV. The low-en­ergy in­jec­tor con­cept in­cludes two in­de­pen­dent trans­ports merg­ing H+ and H beams at the en­trance of RFQ. Beam­lines are aimed to per­form pre­lim­i­nary beam bunch­ing in front of ac­cel­er­a­tor sec­tion with sub­se­quent si­mul­ta­ne­ous ac­cel­er­a­tion of two dif­fer­ent beams in a sin­gle RFQ. The paper dis­cusses de­sign top­ics of new Front End of ac­cel­er­a­tor fa­cil­ity.
 
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2021-TUPAB205  
About • paper received ※ 12 May 2021       paper accepted ※ 28 May 2021       issue date ※ 14 August 2021  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)