Author: Quartullo, D.
Paper Title Page
MOPGW070 Longitudinal Stability of the Hollow Ion Bunches After Momentum Slip-Stacking in the CERN SPS 254
 
  • T. Argyropoulos, A. Lasheen, D. Quartullo, E.N. Shaposhnikova
    CERN, Geneva, Switzerland
 
  Momentum slip-stacking is planned to be used for the lead ion beams in the CERN SPS to double the beam intensity for the High-Luminosity LHC project. During this RF manipulation two SPS batches, controlled by two independent RF systems, are going to be interleaved on an intermediate energy plateau, reducing the bunch spacing from 100 to 50 ns. However, there are limitations how close the frequencies of two RF systems can approach each other, resulting in a hole in the longitudinal bunch particle distribution due to the offset in energy of the recaptured bunches. After filamentation, these bunches should be further accelerated to the SPS top energy, before extraction to the LHC. Macro-particle simulations have shown that Landau damping is lost for the bunches with the smallest longitudinal emittances in the batch, causing un-damped oscillations of the bunch core after recapture. The standard application of an additional, fourth harmonic RF system, successfully used in proton operation, was not able to damp the oscillations at top energy, while it was necessary to switch it on from the moment of recapture. In this paper the longitudinal stability of the bunches after slip-stacking is studied in more details both by macro-particle simulations and analytical calculations.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2019-MOPGW070  
About • paper received ※ 15 May 2019       paper accepted ※ 22 May 2019       issue date ※ 21 June 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
WEPTS039 Momentum Slip-Stacking in CERN SPS for the Ion Beams 3184
 
  • T. Argyropoulos, T. Bohl, A. Lasheen, G. Papotti, D. Quartullo, E.N. Shaposhnikova
    CERN, Geneva, Switzerland
 
  The LHC Injectors Upgrade (LIU) project at CERN aims at doubling the total intensity of the lead ion beam for the High-Luminosity (HL) LHC. Achieving this goal requires using momentum slip-stacking in the SPS, the LHC injector. Slip-stacking will be applied on an intermediate energy plateau to interleave two batches, reducing the bunch spacing from 100 ns to 50 ns and thus increasing the total number of bunches injected into the LHC. Realistic macro-particle simulations, with the present SPS impedance model are used to study and design this complicated beam manipulation. Slip-stacking can be tested experimentally only after the upgrade of the SPS 200 MHz RF system, in 2021. Preliminary, slip-stacking related beam measurements were performed at the end of 2018. In this paper both macro-particle simulations and beam measurements are reported with emphasis given on optimisation of the process, crucial to achieve the required HL-LHC parameters (bunch lengths, beam losses).  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2019-WEPTS039  
About • paper received ※ 15 May 2019       paper accepted ※ 23 May 2019       issue date ※ 21 June 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
THPRB067 Time Varying RF Phase Noise for Longitudinal Emittance Blow-Up 3954
 
  • S.C.P. Albright
    CERN, Geneva, Switzerland
  • D. Quartullo
    Sapienza University of Rome, Rome, Italy
 
  RF phase noise was shown to be effective for controlled longitudinal emittance blow-up in the Proton Synchrotron Booster (PSB) at CERN during beam tests in 2017, with further developments in 2018. At CERN, RF phase noise is used operationally in the Super Proton Synchrotron (SPS) and Large Hadron Collider (LHC). In this paper we show that it is suitable for operation with a variety of beam types in the PSB. In the PSB the synchrotron frequency changes by approximately a factor 4 during the 500 ms acceleration ramp, requiring large changes in the frequency band of the noise. During 2018, a new method of calculating the noise parameters has been demonstrated, which gives upper and lower bounds to the noise frequency band that are smoothly varying through the ramp. The new calculation method has been applied to operational beams accelerated in both single and double RF harmonics, the final results are presented here.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2019-THPRB067  
About • paper received ※ 29 April 2019       paper accepted ※ 21 May 2019       issue date ※ 21 June 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)