Author: Borden, M.J.
Paper Title Page
TUPMP056 LANSCE Vacuum System Improvements in the Last ~10 Years 1375
 
  • T. Tajima, J.E. Bernal, M.J. Borden, J.P. Chamberlin, F.A. Martinez, J.F. O’Hara, A. Poudel, K.A. Stephens
    LANL, Los Alamos, New Mexico, USA
 
  Funding: DOE/NNSA
The Los Alamos Neutron Science Center (LANSCE) accelerator started its operation in 1972. To mitigate the vulnerability due to old equipment and to restore the 120 Hz operation capability we lost a while ago, we have gone through a refurbishment / risk mitigation project since 2007. This paper summarizes the improvements in the vacuum systems in the last ~10 years and shows some data on the downtimes caused by vacuum failures. The refurbished equipment is significantly more maintainable and will contribute to extend the life of this old accelerator, but it has been a challenge to reduce the downtime. Some examples that caused a long downtime will be described.
 
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2019-TUPMP056  
About • paper received ※ 24 May 2019       paper accepted ※ 26 May 2019       issue date ※ 21 June 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
THPTS103 First Results of the Analytical Method Used to Reduce Downtime Risk at an Accelerator Facility 4349
 
  • W.C. Barkley, M.J. Borden, R.W. Garnett, M.S. Gulley, E.L. Kerstiens, M. Pieck, D. Rees, F.E. Shelley, B.G. Smith
    LANL, Los Alamos, New Mexico, USA
 
  Funding: DOE
The Los Alamos Neutron Science Center (LANSCE), like many other accelerator facilities, was built decades ago and has been repurposed when new missions were adopted. With an ongoing beam availability expectation of at least 80% delivered to the Experimental Areas (EAs), a balance between cost of spare equipment and budget has always been a challenge. Beam availability data has been meticulously captured and binned over the years to completely characterize the Structures, Systems and Components (SSCs) and other factors that have caused or contributed to accelerator downtime. Over these years, a critical spares list prioritized the spare equipment purchases that were deemed most critical by the management team. In the span of the years 2013 ’ 2015, significant accelerator upgrades and equipment replacements were performed in a set of activities known as LANSCE-RM. Last year, a new risk-based approach was developed by the management team that included an analytical assessment and a quantitative evaluation of probability and consequence. The resulting risk register (risk-based equipment list) is being used to guide decisions on funding requests and provide justification to mitigate operational risks. A paper by the same authors was published at LINAC 2018 describing this risk-based approach that serves to reformulate the critical spares list. This paper, in the sections that follow, expands on the approach by detailing the specific results of the analyses that led to the first risk register. Additionally, it evaluates the historical beam downtime at LANSCE compared to the current funding allocation choices made to increase the reliability.
 
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2019-THPTS103  
About • paper received ※ 10 May 2019       paper accepted ※ 23 May 2019       issue date ※ 21 June 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)