Paper |
Title |
Page |
MOPOW015 |
Fermi Upgrade Plans |
744 |
|
- A. Fabris, E. Allaria, L. Badano, F. Bencivenga, C. Callegari, F. Capotondi, D. Castronovo, F. Cilento, P. Cinquegrana, M. Coreno, R. Cucini, I. Cudin, G. D'Auria, M.B. Danailov, R. De Monte, G. De Ninno, P. Delgiusto, A.A. Demidovich, S. Di Mitri, B. Diviacco, R. Fabris, W.M. Fawley, M. Ferianis, E. Ferrari, P. Finetti, P. Furlan Radivo, G. Gaio, D. Gauthier, F. Gelmetti, L. Giannessi, F. Iazzourene, M. Kiskinova, S. Krecic, M. Lonza, N. Mahne, M. Malvestuto, C. Masciovecchio, M. Milloch, F. Parmigiani, G. Penco, A. Perucchi, L. Pivetta, O. Plekan, M. Predonzani, E. Principi, L. Raimondi, P. Rebernik Ribič, F. Rossi, E. Roussel, L. Rumiz, C. Scafuri, C. Serpico, P. Sigalotti, M. Svandrlik, C. Svetina, M. Trovò, A. Vascotto, M. Veronese, R. Visintini, D. Zangrando, M. Zangrando
Elettra-Sincrotrone Trieste S.C.p.A., Basovizza, Italy
|
|
|
FERMI has reached its nominal performance on both FEL lines, FEL-1 (12 eV to 62 eV) and FEL-2 (62 eV to 310 eV). After a brief overview of the activities with users, we will describe plans for LINAC , FEL and beamline upgrades for 2016-2018 and beyond. This includes EEHG schemes for FEL-2.
|
|
Export • |
reference for this paper to
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|
TUPOW004 |
Status of the STAR Project |
1747 |
|
- A. Bacci, I. Drebot, L. Serafini, V. Torri
Istituto Nazionale di Fisica Nucleare, Milano, Italy
- R.G. Agostino, R. Barberis, M. Ghedini, F. Martire, C. Pace
UNICAL, Arcavacata di Rende, Italy
- D. Alesini, M. Bellaveglia, J.J. Beltrano, F.G. Bisesto, G. Borgese, B. Buonomo, G. Di Pirro, G. Di Raddo, A. Esposito, A. Gallo, A. Ghigo, F. Iungo, L. Pellegrino, A. Stella, C. Vaccarezza
INFN/LNF, Frascati (Roma), Italy
- A. Cianchi
INFN-Roma II, Roma, Italy
- G. D'Auria, A. Fabris, M. Marazzi
Elettra-Sincrotrone Trieste S.C.p.A., Basovizza, Italy
- V. Petrillo
Universita' degli Studi di Milano, Milano, Italy
- E. Puppin
Politecnico/Milano, Milano, Italy
- M. Rossetti Conti
Universita' degli Studi di Milano & INFN, Milano, Italy
|
|
|
This paper reports on the final design and the work in progress on the STAR project (IPAC2014:WEPRO115), which is under construction at the Univ. of Calabria (Italy). The project is devoted to the construction of an advanced Thomson source of monochromatic tunable, ps-long, polarized X-ray beams, ranging from 40 up to 140 KeV . At present the buildings and main plants have been completed as the acquisition of main components: the RF photo-injector, the accelerating section, laser systems for collision and photo-cathode, RF Power Source and magnets are ready to start installation and site acceptance tests. The design of laser lines is complete and simulated by ZEMAX, aiming to minimize energy losses, optical distortions and providing a tunable experimental setup as well. The RF power network is close to be tested, it's based on a 55MW (2.5us pulse) S-band Klystron driven by a 500kV Pulse Forming Network based modulator and a Low Level RF system, running at 100 Hz. The Control System is been designed using EPICS and allows to manage easily and fastly each machine parameter. We expect to start commissioning the machine by the end of 2016 and obtain the first collisions within the first part of 2017.
|
|