Keyword: rfq
Paper Title Other Keywords Page
MOPHA008 LIPAc RFQ Control System Lessons Learned controls, EPICS, vacuum, operation 200
 
  • L. Antoniazzi, A. Baldo, M.G. Giacchini, M. Montis
    INFN/LNL, Legnaro (PD), Italy
  • A. Jokinen
    F4E, Germany
  • A. Marqueta
    Fusion for Energy, Garching, Germany
 
  The Linear IFMIF Prototype Accelerator (LIPAc)* Radio Frequency Quadrupole (RFQ) will accelerate a 130 mA deuteron beam up to 5 MeV in continuous wave. Proton beam commissioning of RFQ cavity, together with Medium Energy Beam Transport Line (MEBT) and Diagnostics Plate, is now ongoing to characterize the accelerator behavior**. The RFQ Local Control System (LCS) was designed following the project guideline. It was partially assembled and verified during the RFQ power test in Italy***. The final system configuration was pre-assembled and tested in Europe, after that it was transferred to Japan, where it was installed, commissioned and integrated into LIPAc Central Control System (CCS) between November 2016 and July 2017, when the RFQ Radio Frequency (RF) conditioning started****. Now the RFQ LCS has been running for 2 years. During this time, especially in the initial period, the system required several adjustments and modifications to its functionality and interface, together with assistance and instructions to the operation team. This paper will try to collect useful lessons learned coming from this experience.
*http://www.ifmif.org
**LINAC 2018 - THPO062;
***PcAPac 2014 - WPO017;
****ICALEPCS 2017 - THPHA157.
 
poster icon Poster MOPHA008 [3.008 MB]  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-ICALEPCS2019-MOPHA008  
About • paper received ※ 30 September 2019       paper accepted ※ 10 October 2019       issue date ※ 30 August 2020  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
WEPHA153 A State Machine Solution to Control Superconducting Cavities cavity, controls, MMI, EPICS 1452
 
  • D. Touchard, R. Ferdinand, M. Lechartier, F. Pillon, L. Valentin
    GANIL, Caen, France
  • Y. Lussignol
    CEA-DRF-IRFU, France
 
  For the commissioning of the SPIRAL2 accelerating cavities at GANIL, a whole EPICS control-command system has been developed to start the radio-frequency (RF) system. The description of the RF constraints, the functions performed will be discussed to understand the operation of state machines that have been developed. The first results of the commissioning of the control-command of the cavities will be presented.  
poster icon Poster WEPHA153 [1.262 MB]  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-ICALEPCS2019-WEPHA153  
About • paper received ※ 26 September 2019       paper accepted ※ 20 October 2019       issue date ※ 30 August 2020  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)