Author: Lipka, D.
Paper Title Page
MOP12 Production of Cavity Beam Position Monitors for the ARES Accelerator at DESY 47
 
  • D. Lipka, M. Holz, S. Vilcins
    DESY, Hamburg, Germany
 
  The SINBAD facility (Short and INnovative Bunches and Accelerators at DESY) hosts various experiments in the field of production of ultra-short electron bunches and novel high gradient acceleration techniques. The SINBAD facility, also called ARES (Accelerator Research Experiment at SINBAD), is a conventional S-band linear RF accelerator allowing the production of low charge ultra-short electron bunches within a range between 0.5 pC and 1000 pC. The positions of the low charge bunches will be detected by cavity beam position monitors. The principal design is based on the experience from the EU-XFEL cavity beam position monitors. It consists of a 316 LN stainless steel body with a design loaded quality factor of 70, a resonance frequency of 3.3 GHz and a relative wide gap of 15 mm to reach a high peak position sensitivity of 4.25 V/(nC mm). This poster covered, the manufacture of the individual mechanical parts, as well as presents the special features in the manufacture of customer designed UHV feedthroughs.  
DOI • reference for this paper ※ doi:10.18429/JACoW-IBIC2022-MOP12  
About • Received ※ 05 September 2022 — Revised ※ 09 September 2022 — Accepted ※ 11 September 2022 — Issue date ※ 06 November 2022
Cite • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
TUP13 Standard Button BPMs for PETRA IV 249
 
  • S. Strokov, M. Holz, G. Kube, D. Lipka, S. Vilcins
    DESY, Hamburg, Germany
 
  A new diffraction limited light source PETRA IV (DESY, Germany) with ultra-low emittance is currently being designed as an upgrade of the 3rd generation light source PETRA III. For transverse beam position measurements, beam position monitors (BPMs) will be used as an essential part of the beam diagnostic system. There will be a total of about 800 BPMs distributed along the 2.3 km storage ring. The inner diameter of the standard beam pipe, and therefore of most of the BPM chambers, will be 20 mm. The primary purpose of the systems is to provide high-resolution measurements of the transverse position of the electron beam. By specification, the impact of the mechanical tolerances on the position readings should be below 150 microns which is essential for the commissioning of the machine. To achieve this goal, the dependence of the accuracy of the beam position measurement on the tolerances of each manufactured part of the BPM was studied. This paper summarizes the development and optimization of each part of the BPM by using EM simulations performed with CST Studio Suite.  
DOI • reference for this paper ※ doi:10.18429/JACoW-IBIC2022-TUP13  
About • Received ※ 07 September 2022 — Revised ※ 10 September 2022 — Accepted ※ 12 September 2022 — Issue date ※ 01 October 2022
Cite • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
WEP14 Cavity BPM Electronics for SINBAD at DESY 413
 
  • B. Lorbeer, H.T. Duhme, I. Krouptchenkov, T. Lensch, D. Lipka, S. Vilcins, M. Werner
    DESY, Hamburg, Germany
 
  The SINBAD(Short and INnovative Bunches and Accelerators at DESY ) R&D accelerator is planned for studying new concepts for high gradient electron beam acceleration and the generation of ultra-short electron bunches. The accelerator called ARES(Accelerator Research Experiment At DESY) is composed of S-band accelerating structures. In order to achieve the goal of very short electron bunches the electron beam charges generated in the RF Gun can vary in a range from 1nC down to 500fC. In order to measure the beam position with good resolution at the small charge end of 500fC a new cavity BPM(beam position monitor) has been developed. One key component in the BPM system is the custom RF electronics to meet the resolution requirements in the entire charge range. The entire BPM system with a focus on the system design requirements and the utca based RF electronics are presented in this paper.  
DOI • reference for this paper ※ doi:10.18429/JACoW-IBIC2022-WEP14  
About • Received ※ 07 September 2022 — Revised ※ 10 September 2022 — Accepted ※ 12 September 2022 — Issue date ※ 12 December 2022
Cite • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)