Author: Boehme, C.    [Böhme, C.]
Paper Title Page
MOP03 Status Overview of the HESR Beam Instrumentation 23
 
  • C. Böhme
    FZJ, Jülich, Germany
  • A.J. Halama, V. Kamerdzhiev, G.R. Rupsch
    GSI, Darmstadt, Germany
 
  The High Energy Storage Ring (HESR), within the FAIR project, will according to current planning provide anti-proton beams for PANDA and heavy ion beams for a.o. SPARC. With the beam instrumentation devices envisaged in larger quantities, e.g. BPM and BLM, testing is well underway. Other beam instrumentation instruments like Viewer are in late production stage, Scraper is being tested and for the IPM the 1st of series production has started. An overview of the status of the work package beam instrumentation will be presented as well as test bench results of already produced instruments.  
DOI • reference for this paper ※ doi:10.18429/JACoW-IBIC2022-MOP03  
About • Received ※ 08 September 2022 — Revised ※ 09 September 2022 — Accepted ※ 13 September 2022 — Issue date ※ 28 September 2022
Cite • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)