Skrinsky, A.

Paper Title Page
TUACH03 VEPP-2000 Electron-Positron Collider Commissioning 34
 
  • Yu. Shatunov, D. Berkaev, A. Kirpotin, I. Koop, A. Lysenko, I. Nesterenko, E. Perevedentsev, Yu. Rogovsky, A. Romanov, P. Shatunov, D. Shwartz, A. Skrinsky,
    Budker INP, Novosibirsk
 
  VEPP-2000 electron-positron collider construction has been completed in the Budker INP at the beginning of 2007 year. First beam was captured in a special lattice without final focus solenoids. In this regime all systems of power supplies, machine control and beam diagnostics were calibrated and tuned. In the same mode vacuum chamber treatment by synchrotron radiation was performed with electron beam current up to 150 mA. The first test of the round beam option was performed at the energy of 508 MeV with the solenoidal field 10 T in two interaction straight sections. Studies of the beam-beam interaction have been done in "weak-strong" and "strong-strong" regimes. Measurements of beam sizes in the both cases have indicated a beam behavior similar to expectations for the round colliding beams.  
slides icon Transparencies  
   
WEACH09 The Project of T-Charm Factory with Crab Waist in Novosibirsk 77
 
  • E.Levichev, A.Blinov, A.Bogomyagkov, A.Bondar, V.Kiselev, I.Koop, G.Kurkin, P.Logachev, S.Nikitin, I.Okunev, V.M.Petrov, P.Piminov, Yu.Pupkov, D.Shatilov, S.Sinyatkin, V.Smaluk, A.Skrinsky, P.Vobly,
    Budker INP, Novosibirsk
 
  The project of a new-generation t-charm factory is now under consideration in Novosibirsk. A novel approach of the Crab Waist collision scheme allows reaching the luminosity of 1-2*10e35 cm-2s-1. The other features of the facility are: variable energy from 2 GeV to 4.5 GeV (c.m.), longitudinal polarization of electrons at IP, usage of damping wigglers to keep high luminosity for all energy levels, etc. We discuss some of the challenges and opportunities available with the development of the project.  
slides icon Transparencies