MO302 | S1-Global Collaborative Efforts - 8-Cavity-Cryomodule: 2 FNAL, 2 DESY and 4 KEK | 31 |
|
||
In an attempt at demonstrating an average field gradient of 31.5 MV/m as per the design accelerating gradient for ILC, a program called S1-Global is in progress as an international research collaboration among KEK, INFN, FNAL, DESY and SLAC. The design of the S1-G cryomodule began at May 2008 by INFN and KEK. The S1-Global cryomodule was designed to contain eight superconducting cavities from FNAL, DESY and KEK, and to be constructed by joining two half-size cryomodules, each 6 m in length. The module containing four cavities from FNAL and DESY was constructed by INFN. Four KEK cavities have been assembled in the 6 m module which KEK fabricated. All major components were transported to KEK from INFN, FNAL and DESY in December 2009. The assembly of the two 6-m cryomodules started from January 2010 in a collaborative work of FNAL, DESY, INFN and KEK. The construction of the S1-G cryomodule will complete in May, and the cool-down of the S1-G cryomodule is scheduled from June 2010 at the KEK-STF. In this paper, the construction and the cold tests of the S1-Global cryomodule in the worldwide research collaboration will be presented. |
||
|
||
TUP082 | Cryomodule Tests of Tesla-like Cavities in S1-Global for ILC | 602 |
|
||
Cryomodule tests of four Tesla-like superconducting cavities is under preparation in the S1-Global project at KEK. Assembly of the cryomodule was started in January 2010, and the installtion in the STF tunnel was completed in April. First cool-down tests are scheduled in June. The low rf power tests of the Tesla-like cavities will be carried out in July. The high rf power tests are scheduled between September and December, 2010. |