A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   Q   R   S   T   U   V   W   X   Y   Z  

Bucksbaum, P.H.

Paper Title Page
WE201 Operation and Upgrades of the LCLS 694
 
  • J.C. Frisch, R. Akre, J. Arthur, C. Bostedt, J.D. Bozek, A. Brachmann, P.H. Bucksbaum, R.N. Coffee, F.-J. Decker, Y.T. Ding, D. Dowell, S.A. Edstrom, P. Emma, A.S. Fisher, J.N. Galayda, A. Gilevich, J.B. Hastings, G.R. Hays, P. Hering, Z. Huang, R.H. Iverson, H. Loos, M. Messerschmidt, A. Miahnahri, S.P. Moeller, H.-D. Nuhn, D.F. Ratner, J.A. Rzepiela, D.C. Schultz, T.J. Smith, H. Tompkins, J.L. Turner, J.J. Welch, J. Wu, G. Yocky
    SLAC, Menlo Park, California
  • R.M. Bionta
    LLNL, Livermore, California
  • G. Pile
    ANL, Argonne
 
 

The LCLS FEL began user operations in September 2009, with photon energies from 800eV to 2 KeV and pulse energies above 2 mJ. Both long pulse (50-200 femtosecond FWHM) and short pulse (<10 femtosecond FWHM at 150 uJ) pulses were delivered at user request. In addition the FEL was operated at fundamental photon energies up to 10 KeV in preparation for hard X-ray experiments. FEL operating parameters, performance and reliability results will be presented, in addition to plans for upgrades to the facility.

 

slides icon

Slides