A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   Q   R   S   T   U   V   W   X   Y   Z  

Arakawa, D.A.

Paper Title Page
MOPE011 Shot-by-shot Beam Position Monitor System for Beam Transport Line from RCS to MR in J-PARC 978
 
  • M. Tejima, D.A. Arakawa, Y. Hashimoto
    KEK, Ibaraki
  • K. Hanamura
    MELCO SC, Tsukuba
  • N. Hayashi
    JAEA/J-PARC, Tokai-Mura, Naka-Gun, Ibaraki-Ken
  • K. Satou, T. Toyama, N. Yamamoto
    J-PARC, KEK & JAEA, Ibaraki-ken
 
 

To maintain the beam orbit of beam transport line from RCS to MR in J-PARC (3-50BT), 14 beam position monitors (BPMs) were installed. Their signals gathered in the local control building (D01) have been measured by using 14 digitizing oscilloscopes. The data acquisition system have a performance of shot-by-shot measurement.

 
MOPE012 Performance of the Main Ring BPM during the Beam Commissioning at J-PARC 981
 
  • T. Toyama, D.A. Arakawa, S. Hiramatsu, S. Igarashi, S. Lee, H. Matsumoto, J.-I. Odagiri, M. Okada, M. Tejima, M. Tobiyama
    KEK, Ibaraki
  • K. Hanamura, S. Hatakeyama
    MELCO SC, Tsukuba
  • Y. Hashimoto, K. Satou, J. Takano
    J-PARC, KEK & JAEA, Ibaraki-ken
  • N. Hayashi
    JAEA/J-PARC, Tokai-Mura, Naka-Gun, Ibaraki-Ken
 
 

Experiences of operating BPM's during beam commissioning at the J-PARC MR are reported. The subjects are: (1) bug report, statistics and especially the effect of a beam duct step, (2) position resolution estimation (<30 micrometers with 1 sec averaging), (3) beam based alignment.

 
TUPEA047 Digital LLRF System for STF S1 Global 1437
 
  • S. Michizono, D.A. Arakawa, S. Fukuda, H. Katagiri, T. Matsumoto, T. Miura, Y. Yano
    KEK, Ibaraki
 
 

S1 global will be operated at STF in KEK, where total 8 cavities will be installed. The digital llrf system to control the vector sum of the field gradients to be flat has been developed. All the digital llrf system including rf monitoring, piezo-control system will be shown. The new llrf system suitable for the DRFS scheme, which is also studied during S1 grobal, is also under development.

 
TUPEA048 Low Level RF System for cERL 1440
 
  • T. Miura, A. Akiyama, D.A. Arakawa, S. Fukuda, H. Katagiri, T. Matsumoto, S. Michizono, J.-I. Odagiri, Y. Yano
    KEK, Ibaraki
 
 

The compact ERL(cERL) is the energy recovery linac(ERL) test facility that is under construction at KEK. The stability of accelerating electric field of 0.1% rms in amplitude and 0.1deg. in phase is required for LLRF system. The status of LLRF system for cERL will be reported.

 
TUPE091 Recent Progress in the Energy Recovery Linac Project in Japan 2338
 
  • S. Sakanaka, M. Akemoto, T. Aoto, D.A. Arakawa, S. Asaoka, A. Enomoto, S. Fukuda, K. Furukawa, T. Furuya, K. Haga, K. Hara, K. Harada, T. Honda, Y. Honda, H. Honma, T. Honma, K. Hosoyama, M. Isawa, E. Kako, T. Kasuga, H. Katagiri, H. Kawata, Y. Kobayashi, Y. Kojima, T. Matsumoto, H. Matsushita, S. Michizono, T.M. Mitsuhashi, T. Miura, T. Miyajima, H. Miyauchi, S. Nagahashi, H. Nakai, H. Nakajima, E. Nakamura, K. Nakanishi, K. Nakao, T. Nogami, S. Noguchi, S. Nozawa, T. Obina, S. Ohsawa, T. Ozaki, C.O. Pak, H. Sakai, H. Sasaki, Y. Sato, K. Satoh, M. Satoh, T. Shidara, M. Shimada, T. Shioya, T. Shishido, T. Suwada, M. Tadano, T. Takahashi, R. Takai, T. Takenaka, Y. Tanimoto, M. Tobiyama, K. Tsuchiya, T. Uchiyama, A. Ueda, K. Umemori, K. Watanabe, M. Yamamoto, S. Yamamoto, Y. Yamamoto, Y. Yano, M. Yoshida
    KEK, Ibaraki
  • M. Adachi, M. Katoh, H. Zen
    UVSOR, Okazaki
  • R. Hajima, R. Nagai, N. Nishimori, M. Sawamura
    JAEA/ERL, Ibaraki
  • H. Hanaki
    JASRI/SPring-8, Hyogo-ken
  • H. Iijima, M. Kuriki
    HU/AdSM, Higashi-Hiroshima
  • I. Ito, H. Kudoh, N. Nakamura, S. Shibuya, K. Shinoe, H. Takaki
    ISSP/SRL, Chiba
  • H. Kurisu
    Yamaguchi University, Ube-Shi
  • M. Kuwahara, T. Nakanishi, S. Okumi
    Nagoya University, Nagoya
  • S. Matsuba
    Hiroshima University, Graduate School of Science, Higashi-Hiroshima
  • T. Muto
    Tohoku University, School of Scinece, Sendai
  • K. Torizuka, D. Yoshitomi
    AIST, Tsukuba
 
 

Future synchrotron light source using a 5-GeV-class energy recovery linac (ERL) is under proposal by our Japanese collaboration team, and we are conducting active R&D efforts for that. We are developing super-brilliant DC photocathode guns, two types of cryomodules for both injector and main superconducting linacs, 1.3 GHz high CW-power rf sources, and other important components. We are also constructing a compact ERL for demonstrating the recirculation of low-emittance, high-current beams using those key components. We present our recent progress in this project.

 
WEPEB007 The Data Acquisition System of Beam Position Monitors in J-PARC Main Ring 2698
 
  • S. Hatakeyama, N. Hayashi
    JAEA/J-PARC, Tokai-Mura, Naka-Gun, Ibaraki-Ken
  • D.A. Arakawa, Y. Hashimoto, S. Hiramatsu, J.-I. Odagiri, M. Tejima, M. Tobiyama, T. Toyama, N. Yamamoto
    KEK, Ibaraki
  • K. Hanamura
    MELCO SC, Tsukuba
  • K. Satou
    J-PARC, KEK & JAEA, Ibaraki-ken
 
 

The Data Acquisition System of Beam Position Monitors(BPMs) in J-PARC Main Ring are consist of 186 Linux-based Data Processing Cirquits(BPMCs) and 12 EPICS IOCs. They are important tool to see the COD and turn-by-turn beam positions. This report describes the process of the data reconstruction which include how the various calibration constants are applied.

 
THPEB046 RF Source of Compact ERL in KEK 3981
 
  • S. Fukuda, M. Akemoto, D.A. Arakawa, H. Honma, H. Katagiri, S. Matsumoto, T. Matsumoto, S. Michizono, T. Miura, H. Nakajima, K. Nakao, S. Sakanaka, T. Shidara, T. Takahashi, Y. Yano, M. Yoshida
    KEK, Ibaraki
 
 

ERL (Energy Recovery Linac) of 5GeV energy is a future plan in KEK and in order to study the technical feasibility, construction of a compact ERL machine (cERL) is considered. Beam energy and current of cERL are 245MeV and 100mA, respectively. As 1.3 GHz frequency and super conducting cavity are chosen for the RF system, similar technology with KEK STF is employed. From 2008, KEK started the preparation of cERL and one RF unit of injector linac is introduced in this fiscal 2009. A new cw klystron of 300kW out put power, 150kW Y-type circulator and high power water load were developed in FY2009. DC power supply was under manufacturing. Preliminary test of HLRF and the high power couplers are scheduled in the Photon Factory site by making use of the old DC power supply. For main accelerator, we also introduced a 30kW IOT and a 35kW klystron and a DC power supply. At the same time, cERL is determined to be constructed in the East Counter Hall in KEK and the design layout is preceded. In this paper, the recent RF source development of cERL is described. Layout of the east counter hall, where cERL is constructed, is progressed and shown in this report.

 
THPD007 The Linac Upgrade Plan for SuperKEKB 4290
 
  • T. Sugimura, M. Akemoto, D.A. Arakawa, A. Enomoto, S. Fukuda, K. Furukawa, T. Higo, H. Honma, M. Ikeda, E. Kadokura, K. Kakihara, T. Kamitani, H. Katagiri, M. Kurashina, S. Matsumoto, T. Matsumoto, H. Matsushita, S. Michizono, K. Mikawa, T. Miura, H. Nakajima, K. Nakao, Y. Ogawa, S. Ohsawa, M. Satoh, T. Shidara, A. Shirakawa, T. Suwada, T. Takenaka, Y. Yano, K. Yokoyama, M. Yoshida
    KEK, Ibaraki
 
 

The next generation B-factory 'SuperKEKB' project whose target luminosity is 8 ×1035 cm-2s-1 is under consideration. A 'nano-beam scheme' is introduced to the SuperKEKB. In the scheme, an electron beam (Energy = 7 GeV, Charge = 3-4 nC/bunch, Vertical emittance =2.8 x 10-5 m) and a positron beam (Energy = 4 GeV, Charge = 4 nC/bunch, Vertical emittance = 1.6 x 10-5 m), are required at the end of injector linac. They are quite challenging targets for the present linac. In order to meet the requirements, we will introduce some new components to the linac. They are a photo-cathode RF gun for an electron beam, a positron capture section using new L-band cavities, a newly designed positron-generation target system and a damping ring for a positron beam. This presentation shows a strategy of our injector upgrade.