MOB3O04 | The Construction Status of the SuperKEKB Control System | 14 |
|
||
SuperKEKB is the upgrade of KEKB, the asymmetric energy electron-positron collider for the B-factory experiment in Japan. It aims at the 40-times higher luminosity than the world record by KEKB. The KEKB control system has been built based on EPICS at the equipment layer and scripting languages at the operation layer. The SuperKEKB control system continues to employ these frameworks while we implement new features for the successful operation at such a high luminosity. As the commissioning of the SuperKEKB main storage rings is scheduled to start in 2016, the construction of the control system is now in the final phase. We have upgraded and reinforced the network system, server computers and operator consoles. Most of the VME-based IOCs (I/O Controllers), which has been widely used in KEKB, are upgraded while the PLC-based IOCs are also widely introduced. The new timing system has been developed in order to handle the complicated injection scheme of the SuperKEKB accelerator complex efficiently. The new beam abort trigger system and the new beam gate control system have been developed, and so on. The construction status of the SuperKEKB accelerator control system will be presented. | ||
Slides MOB3O04 [11.620 MB] | ||
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |
MOPGF035 | Control System Status of SuperKEKB Injector Linac | 170 |
|
||
Toward SuperKEKB project, the injector linac upgrade is ongoing for aiming at the stable electron/positron beam operation with low emittance and high intensity bunch charge. To obtain such high quality beam, we have being commissioning many newly developed subsystems including a low emittance photocathode rf gun since October of 2013. Eventually, we will perform the simultaneous top-up for the four independent storage rings including two light sources. The stable beam operation as long as possible is desired since the prospective physics results strongly depends on the reliability and availability of accelerator operation. Since the middle stage of KEKB project, the injector linac control system has been gradually transferred to the EPICS based one from the in-house system based on RPC. We are expanding the existing control system for the newly installed devices like a network attached power supply, timing jitter monitoring system, and so on. In addition, many commissioning tools are now under development to accelerate the high quality beam development. In this paper, we will describe the present status of injector linac control system and future plan in detail. | ||
Poster MOPGF035 [1.144 MB] | ||
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |
WEC3O04 | New Event Timing System for Damping Ring at SuperKEKB | 629 |
|
||
SuperKEKB is the upgrade of KEKB, which is the world's largest luminosity accelerator at KEK. One of key items to realize 40 times larger luminosity than that of KEKB is damping ring (DR) for positron injection. The injector linac (LINAC) once stores the produced positrons into DR and suppress their emittance. Then low emittance positrons are extracted from DR and injected into the main ring. For this complicated injection process, the Event Timing System* for LINAC** was upgraded and its soundness is demonstrated by injecting electrons into two light source rings***. New Event modules were also installed under the Event network for LINAC as the sub timing system for DR. New Event modules were developed which can be operated with the different Event clock from that of upstream modules. It solves the difference in RF frequency between LINAC (2856MHz) and DR (509MHz). This sub timing system can manage the triggers towards totally 84 BPMs at DR although it consists of only 5 Event modules. The timing of those triggers can be independently set in more precise than 100ps. The requirements to DR timing system and the newly developed modules with its configuration at DR are explained.
*H. Kaji et al., THCOCA04, Proc. of ICALEPCS'13, San Francisco, CA.**H. Kaji et al., TUPRI109, Proc. of IPAC'14, Dresden, Germany.***Abstract submitted to IPAC'15. |
||
Slides WEC3O04 [1.500 MB] | ||
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |
THHC2O01 | Beam Property Management at KEK Electron/Positron 7-GeV Injector Linac | 1123 |
|
||
The electron/positron injector linac at KEK has injected a variety of beams into the electron accelerator complex of SuperKEKB collider and light sources for particle physics and photon science experiments for more than 30 years. The beam property of electrons and positrons varies in energy from 2.5 GeV to 7 GeV and in bunch charge from 0.2 nC to 10 nC, and their stability requirements are different depending on the injected storage ring. They have to be switched by pulse-to-pulse modulation at 50 Hz. The emittance control is especially crucial to achieve the goal at SuperKEKB and is under development. The beam energy management becomes more important as it affects all of the beam properties. Beam acceleration provided by 60 RF power station should be properly distributed considering redundancy and stability. Thus, the equipment controls are also restructured in order to enable the precise control of the beam properties, based on the synchronized event control system and EPICS control system. The strategy and status of the upgrade is described in this paper from the practical aspects of device controls, online simulation and operation. | ||