A   B   C   D   E   F   G   H   I   L   M   N   O   P   Q   R   S   T   V  

remote-handling

Paper Title Other Keywords Page
F-01 A Secondary Radioactive Beam Line for the SPIRAL 2 Project: First Step, the Design Study ion, radiation, beam-transport, extraction 346
 
  • F. Osswald, A. Khouaja, M. Rousseau
    CNRS/IN2P3, Strasbourg
 
 

This second generation radioactive ion beam facility will be constructed at GANIL and be operational in 2012 with stable beams and 2013 with radioactive ion beams. The aim of the installation is to produce high-intensity, high-quality radioactive ion beams of isotopes from large regions of the chart of nuclei in the range of 3 to 240u. Following description corresponds to the conceptual design study of a low energy RIB transport line for the SPIRAL 2 project.