Author: Garoby, R.
Paper Title Page
MOXLR01 The High Luminosity Challenge: Potential and Limitations of High-Intensity High-Brightness Beams in the LHC and its Injectors 1
 
  • R. De Maria, G. Arduini, D. Banfi, J. Barranco, H. Bartosik, E. Benedetto, R. Bruce, O.S. Brüning, R. Calaga, F. Cerutti, H. Damerau, L.S. Esposito, S.D. Fartoukh, M. Fitterer, R. Garoby, S.S. Gilardoni, M. Giovannozzi, B. Goddard, B. Gorini, K. Hanke, G. Iadarola, M. Lamont, M. Meddahi, B. Mikulec, N. Mounet, E. Métral, Y. Papaphilippou, T. Pieloni, S. Redaelli, L. Rossi, G. Rumolo, E.N. Shaposhnikova, G. Sterbini, E. Todesco, R. Tomás, F. Zimmermann
    CERN, Geneva, Switzerland
  • A. Valishev
    Fermilab, Batavia, Illinois, USA
 
  Funding: Research supported by EU FP7 HiLumi LHC - Grant Agreement 284404 and by DOE via the US-LARP program.
High-intensity and high-brightness beams are key ingredients to maximize the integrated luminosity of the LHC and exploit its full potential. This contribution will describe the optimization of the beam and machine parameters to maximize the integrated luminosity for the LHC experiments, by taking into account the expected intensity and brightness reach of the LHC and its injector chain and the capabilities of the detectors for the next run and foreseen upgrade scenarios.
 
slides icon Slides MOXLR01 [2.574 MB]  
 
TUO1AB02 Upgrades of the RF Systems in the LHC Injector Complex 165
 
  • H. Damerau, M.E. Angoletta, T. Argyropoulos, P. Baudrenghien, A. Blas, T. Bohl, A.C. Butterworth, A. Findlay, R. Garoby, S.S. Gilardoni, S. Hancock, W. Höfle, J.C. Molendijk, E. Montesinos, M.M. Paoluzzi, D. Perrelet, C. Rossi, E.N. Shaposhnikova
    CERN, Geneva, Switzerland
 
  In the framework of the LHC Injector Upgrade (LIU) project the radio-frequency (RF) systems of the synchrotrons in the LHC injector chain will undergo significant improvements to reach the high beam intensity and quality required by the High-Luminosity (HL) LHC. Following the recent upgrade of the longitudinal beam control system in the PS Booster (PSB), tests with Finemet cavities are being performed in view of a complete replacement of the existing RF systems in the PSB by ones based on this technology. In the PS a similar wide-band Finemet cavity has been installed as a longitudinal damper. New 1-turn delay feedbacks on the main accelerating cavities to reduce their impedance have also been commissioned. Additional feedback and beam control improvements are foreseen. A major upgrade of the main RF system in the SPS by regrouping sections of its travelling wave cavities, increasing the number of cavities from four to six, will reduce beam-loading and allow higher intensities to be accelerated. The upgrade includes the installation of two new RF power plants and new feedback systems. All upgrades will be evaluated with respect to their expected benefits for the beams to the LHC.  
slides icon Slides TUO1AB02 [4.317 MB]