MOI1A02 J-PARC Recovery Status linac, extraction, kicker, vacuum 6
 
  • K. Yamamoto
    JAEA/J-PARC, Tokai-Mura, Naka-Gun, Ibaraki-Ken, Japan
 
  J-PARC facilities were seriously damaged by the Great East Japan Earthquake in March 2011, but all facilities resumed a beam operation from December 2012. We report the operation status of J-PARC accelerators after the earthquake.  
slides icon Slides MOI1A02 [12.726 MB]  
 
MOP244 CERN High-Power Proton Synchrotron Design Study for LAGUNA-LBNO Neutrino Production proton, linac, synchrotron, target 154
 
  • R. Steerenberg, M. Benedikt, I. Efthymiopoulos, F. Gerigk, Y. Papaphilippou
    CERN, Geneva, Switzerland
 
  Within the framework of the LAGUNA-LBNO project, CERN has started design studies in view of producing neutrinos for future long base line neutrino experiments. These design studies foresee a staged approach in the increase of the primary proton beam power, used for the neutrino production. The first step consists of exploring the feasibility of a CERN SPS beam power upgrade from the existing 500 kW, presently available to CNGS, to 750 kW. This beam should then be transferred to a new to be built neutrino beam line that is dimensioned for a beam power of 2 MW. The 2 MW proton beam is to be provided at a subsequent stage by a 30 - 50 GeV High-Power Proton Synchrotron (HP-PS), which is a major part of the design studies. This paper will provide an overview of the project and then focus on the preliminary ideas for the HP-PS design study.