Keyword: monitoring
Paper Title Other Keywords Page
TUO1C02 Online Monitoring System for the Waste Beam in the 3-GeV RCS of J-PARC injection, proton, linac, target 297
 
  • P.K. Saha, H. Harada, S. Hatakeyama, N. Hayashi, H. Hotchi, K. Yamamoto, M. Yoshimoto
    JAEA/J-PARC, Tokai-Mura, Naka-Gun, Ibaraki-Ken, Japan
 
  We have established two independent methods for monitoring the waste beam of only about 0.4% in the 3 GeV Rapid Cycling Synchrotron of the Japan Proton Accelerator. Although using conventional monitor systems, the measurement technique made it possible for clearly measuring such a waste beam even with significantly low error. One of the method uses a current transformer to measure the waste beam as a whole, while the other one uses a multi-wire profile monitor for clearly measuring beam profiles of both un-stripped and partially stripped components of the waste beam. While the raw signal measured by a CT (current transformer) contains a large noise, an FFT (Fast Fourier Transformation) analysis made it possible to clearly identify the beam signal corresponding to the frequency of the intermediate pulse. The waste beam was measured to be (0.38±0.03)%. Being non destructive, the 1st method is efficiently operating for online monitoring of the waste beam during the RCS user operation so as to directly know the the stripper foil condition and would have great importance for higher power operation.  
slides icon Slides TUO1C02 [2.687 MB]