WGD11 | Beam Commissioning of J-PARC MR | 376 |
|
||
Beam commissioning of J-PARC Main Ring (MR) has been started in May, 2008. The 3-GeV beams extracted from the rapid cycling synchrotron (RCS) are injected into the MR and captured by rf, and then extracted to a 3-GeV beam dump. In this paper, we present results of the first-stage commissioning run from May to June 2008. After five months shutdown for installation of fast extraction and slow extraction devices, the second-stage commissioning run will be started in December 2008. |
||
CPL04 | Commissioning Strategies, Operations and Performance, Beam Loss Management, Activation, Machine Protection | 489 |
|
||
The working group D covered
|
||
|