WGE12 The Korean Proton Engineering Frontier Project 422
 
  • J.-H. Jang, Y.-S. Cho, B.H. Choi, J-Y. Kim, K. R. Kim, J. W. Park
    KAERI, Daejon
 
 

The main purposes of the proton engineering frontier project (PEFP) are developing 100-MeV proton linac and supplying 20-MeV and 100-MeV proton beams to user group. The 20-MeV part of the linac with 24% beam duty has been successfully installed and tested at the KAERI site. Now we are supplying 20-MeV proton beams to users in a restricted beam condition. The fabrication of the remaining part of the DTL with the beam duty of 8% is in progress. The PEFP user facility includes 5 beam lines for 20-MeV and 100-MeV beams, respectively. Form the user surveys the purposes and beam specs are determined for the beam lines. The characteristics of the PEFP beam supplying systems are using the AC magnets to periodically distribute proton beams into several beam lines. At the same time, PEFP concentrates on developing the potential user group of the high intensity proton beams. Several beam utilization programs are under way for this purpose. The civil construction is scheduled to start at the end of this year. The present status and progress of the project are summarized in detail.

 

slides icon

Slides