Paper | Title | Page |
---|---|---|
MOOC02 | Cavity BPM System for ATF2 | 23 |
|
||
In this paper we summarise our 2-year experience operating the Cavity Beam Position Monitor (CBPM) system at the Accelerator Test Facility (ATF) in KEK. The system currently consists of 41 C and S-band CBPMs and is the main diagnostic tool for the new ATF2 extraction beamline. We concentrate on issues related to the scale of the system and also consider long-term effects, most of which are undetectable or insignificant in smaller experimental prototype systems. We consistently show sub-micron BPM resolutions and week-to-week scale drifts of an order of 1%. | ||
![]() |
Slides MOOC02 [2.075 MB] | |
TUPD61 | Multi Optical Transition Radiation System for ATF2 | 446 |
|
||
Funding: FPA2010-21456-C02-00 In this paper we describe the calibration tests, software development and first measurements of a Multi Optical Transition Radiation System in the beam diagnostic section of the Extraction (EXT) line of ATF2, close to the multi wire scanner system. First 2D emittance measurements have been made with success and the system is being used normally for coupling correction. 4D emittance reconstruction algorithm is under improvement and implementation before a systematic measurement campaign and comparison with wire scanners is done. This will be a definitive test of the OTR as a beam emittance diagnostic device, which will give the ability to measure the beam emittance with high statistics, giving a low error and a good understanding of emittance jitter. |
||