A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   R   S   T   U   V   W   X   Y   Z  

Peschke, C.

Paper Title Page
TUIOB02 Simulations of Stochastic Cooling of Antiprotons in the Collector Ring CR 58
 
  • C. Dimopoulou, A. Dolinskii, T. Katayama, F. Nolden, C. Peschke, M. Steck
    GSI, Darmstadt
  • D. Möhl, L. Thorndahl
    CERN, Geneva
 
  The Collector Ring at FAIR will be equipped with pertinent stochastic cooling systems in order to achieve fast cooling of the hot secondary beams, antiprotons and rare isotopes, thus profiting from the repetition rate of the SIS100 synchrotron. Detailed simulations of the system performance are needed for optimization as well as input for the users of the CR pre-coooled beams, e.g. HESR. We presently focus on the antiproton cooling in the band 1-2 GHz. After a short overview, results from Fokker-Planck simulations with the CERN code of the momentum cooling of antiprotons will be presented. The performance of the betatron cooling of antiprotons, which has to proceed simultaneously with the momentum cooling, was calculated separately by means of an analytical model. First results and their implications will be discussed, including an outlook to future simulation work.  
slides icon Slides