TUPLT187 SNS Extraction Kicker Power Supply Control 1568
 
  • J.-L. Mi, L. Hoff, R.F. Lambiase, Y.Y. Lee, J. Sandberg, Y. Tan, N. Tsoupas, R. Zapasek, W. Zhang
    BNL, Upton, Long Island, New York
 
  There are fourteen PFN power supplies, which will be installed in the SNS Extraction Kicker System. This paper will introduce these fourteen-power supplies arrangement and control schematic. These control instruments and boards are installed into four standard racks. Some of the control boards functions will be list in this paper. Control racks and some control boards pictures will be shown in this paper.  
WEODCH01 1.5-GeV FFAG Accelerator as Injector to the BNL-AGS 159
 
  • A. Ruggiero, M. Blaskiewicz, T. Roser, D. Trbojevic, N. Tsoupas, W. Zhang
    BNL, Upton, Long Island, New York
 
  A 1.5-GeV Fixed-Field Alternating-Gradient (FFAG) Accelerator has been recently proposed as a new injector to the Alternating-Gradient Synchrotron (AGS) of Brookhaven National Laboratory (BNL). It is being considered as a replacement of the present 1.5-GeV AGS Booster. The substitution will enhance the performance of the AGS accelerator facility in a variety of ways. It would still allow acceleration of all hadronic particles: protons, and heavy-ions. The major benefit is that it would considerably shorten the typical combined AGS acceleration cycle, and, consequently, may yield to an improvement of beam stability, intensity and size. The AGS-FFAG will also facilitate the proposed upgrade of the AGS facility toward a 1-MW average proton beam power. The paper describes a compact FFAG design for acceleration of protons from 200 MeV to 1.5 GeV. The circumference is about 250 m. The lattice is a periodic sequence of FDF triplets of combined-function magnets. An adjusted field profile has been calculated to compensate the variation of the main lattice functions with momentum. At injection, a beam pulse 130 μs long of negative-ions (H?) is stacked with the charge-exchange method. Acceleration of one pulse with 2.5 x 1013 protons takes about 130 μs, if harmonic-jump scheme is used in conjunction with the choice of 201.25 MHz. Four of such beam pulses are required to fill entirely the AGS. The entire filling process thus takes less than one millisecond.  
Video of talk
Transparencies
WEPKF087 SNS Extraction Fast Kicker Pulsed Power System 1810
 
  • W. Zhang, H. Hahn, J.-L. Mi, C. Pai, J. Sandberg, Y. Tan, N. Tsoupas, J. Tuozzolo, D.S. Warburton, J. Wei
    BNL, Upton, Long Island, New York
  • R. Cutler, K. Rust
    ORNL/SNS, Oak Ridge, Tennessee
 
  The Spallation Neutron Source (SNS) is a next generation high intensity beam facility. Its Accumulator Ring Extraction Fast Kicker System is a very high peak power, high average power, high precision pulse-waveform, ultra-low beam impedance, and high repetition rated pulsed power system. It has been successfully design and developed at Brookhaven National Laboratory. This system will consist of fourteen identical high voltage modulators and fourteen extraction magnet sections located inside of the SNS accumulator ring. The overall system output will reach multiple GW peak power with 60 Pulse-per-second repetition rates. The techniques of reducing impedance, improving rise time, and minimizing ripples will be discussed. The lifetime considerations, issues of the system design, development and construction are presented in this paper.  
MOPLT165 Luminosity Increases in Gold-gold Operation in RHIC 917
 
  • W. Fischer, L. Ahrens, J. Alessi, M. Bai, D. Barton, J. Beebe-Wang, M. Blaskiewicz, J.M. Brennan, D. Bruno, J. Butler, R. Calaga, P. Cameron, R. Connolly, T. D'Ottavio, J. DeLong, K.A. Drees, W. Fu, G. Ganetis, J. Glenn, T. Hayes, P. He, H.-C. Hseuh, H. Huang, P. Ingrassia, U. Iriso, R. Lee, Y. Luo, W.W. MacKay, G. Marr, A. Marusic, R. Michnoff, C. Montag, J. Morris, T. Nicoletti, B. Oerter, C. Pearson, S. Peggs, A. Pendzick, F.C. Pilat, V. Ptitsyn, T. Roser, J. Sandberg, T. Satogata, C. Schultheiss, A. Sidi-Yekhlef, L. Smart, S. Tepikian, R. Tomas, D. Trbojevic, N. Tsoupas, J. Tuozzolo, J. Van Zeijts, K. Vetter, K. Yip, A. Zaltsman, S.Y. Zhang, W. Zhang
    BNL, Upton, Long Island, New York
 
  After an exploratory phase, during which a number of beam parameters were varied, the RHIC experiments now demand high luminosity to study heavy ion collisions in detail. Presently RHIC operates routinely above its design luminosity. In the first 4 weeks of its current operating period (Run-4) the machine has delivered more integrated luminosity that during the 14 weeks of the last gold-gold operating period (Run-2). We give an overview of the changes that increased the instantaneous luminosity and luminosity lifetime, raised the reliability, and improved the operational efficiency.  
TUPLT188 SNS Extraction Kicker Power Supply Manufacture Status 1571
 
  • J.-L. Mi, H. Hahn, R.F. Lambiase, Y.Y. Lee, C. Pai, J. Sandberg, Y. Tan, N. Tsoupas, D.S. Warburton, R. Zapasek, W. Zhang
    BNL, Upton, Long Island, New York
 
  There are fourteen PFN power supplies, which will be installed in the SNS Extraction Kicker System. The Pulse Forming Network (PFN) power supplies for the SNS Extraction kicker were designed by Brookhaven. The basic configuration of the PFN is a lumped element Blumlein pulse forming network (BPFN). The PFN and power supply are fabricated by an industrial company. The first article of. PFN and power supply has been manufactured and tested with a dummy load at the company and onsite with the prototype magnet. The PFN has been tested beyond its specification and has met all requirements including rise time, pulse flatness, amplitude and pulse repetition rate. Additional heat runs are scheduled. The transverse coupling impedance of the kicker system with attached PFN has been measured. This paper will report on the SNS Extraction Kicker Power Supply engineering status, and will include output waveforms, impedance measurements, and production projections.  
TUPLT120 Commissioning of Electron Cooler EC-300 1419
 
  • V.B. Reva, E.A. Bekhtenev, V.N. Bocharov, A.V. Bubley, Y. Evtushenko, A.D. Goncharov, A.V. Ivanov, V.I. Kokoulin, V.V. Kolmogorov, M.N. Kondaurov, S.G. Konstantinov, V.R. Kozak, G.S. Krainov, Ya.G. Kruchkov, E.A. Kuper, A.S. Medvedko, L.A. Mironenko, V.M. Panasyuk, V.V. Parkhomchuk, K.K. Schreiner, B.A. Skarbo, A.N. Skrinsky, B.M. Smirnov, M.A. Vedenev, R. Voskoboinikov, M.N. Zakhvatkin, N.P. Zapiatkin
    BINP SB RAS, Novosibirsk
  • J. Li, W. Lu, L.J. Mao, Z.X. Wang, X.B. Yan, X.D. Yang, J.H. Zhang, W. Zhang, H.W. Zhao
    IMP, Lanzhou
 
  The article deals with the commissioning of electron cooler EC-300. It was designed and manufactured for CSR experiment (IMP, Lanzhou, China) by BINP, Russia. The energy of electron beam is up to 300 keV, the electron current is up to 3 A, the magnetic field in the cooling section is up to 1.5 kG. The major innovation of the cooler is the variable profile of electron beam, the electrostatic bends of the electron beam and the system of the magnetic field correction. During commissioning the linearity of the magnetic field 10-6 was obtained, the recuperation efficiency was observed up 10-6 , the pressure of residual gas in the vacuum chamber was 5? 10-11 torr during operation with the electron beam. The CSRe cooler for IMP is a new step at cooling technique and the first results achieved during commissioning are very interesting for accelerator physics.