A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   Q   R   S   T   U   V   W   X   Y   Z    

Yoshioka, M.

  
Paper Title Page
WEPKF048 Characteristics of Ground Motion at KEK and SPring-8 1711
 
  • Y. Nakayama, T. Ito
    JPOWER, Kanagawa-ken
  • S. Matsui, C. Zhang
    JASRI/SPring-8, Hyogo
  • R. Sugahara, S. Takeda, H. Yamaoka, M. Yoshioka
    KEK, Ibaraki
  • S. Yamashita
    University of Tokyo, Tokyo
 
  Authors Y. Nakayama, T. Ito, (JPOWER); R. Sugahara, S. Takeda, H.Yamaoka, M.Yoshioka (KEK); S.Matsui, C.Zhang (SPring-8); S. Yamashita (ICEPP): Abstract Stability of ground is preferable for accelerator beam operation. We have measured ground motion of ground at the KEKB and SPring-8 site, where the ground has quite different characteristics each other. In this paper, some of analysis results are shown, and the characteristics of the ground motion at the KEKB site and those at the Spring-8 site are compared.  
THOACH03 Top-up Operation at SPring-8 - Towards Maximizing the Potential of a 3rd Generation Light Source 222
 
  • H. Tanaka, T. Aoki, T. Asaka, S. Daté, K. Fukami, Y. Furukawa, H. Hanaki, N. Hosoda, T. Kobayashi, N. Kumagai, M. Masaki, T. Masuda, S. Matsui, A. Mizuno, T. Nakamura, T. Nakatani, T. Noda, T. Ohata, H. Ohkuma, T. Ohshima, M. Oishi, S. Sasaki, J. Schimizu, M. Shoji, K. Soutome, M. Suzuki, S. Suzuki, S. Takano, M. Takao, T. Takashima, H. Takebe, K. Tamura, R. Tanaka, T. Taniuchi, Y. Taniuchi, K. Tsumaki, A. Yamashita, K. Yanagida, H. Yonehara, T. Yorita
    JASRI/SPring-8, Hyogo
  • M. Adachi, K. Kobayashi, M. Yoshioka
    SES, Hyogo-pref.
 
  Top-up operation maximizes research activities in a light source facility by an infinite beam lifetime and photon beam stability. We have been improving the SPring-8 accelerators to achieve the ideal top-up operation. For the perturbation-free injection, we adjusted the magnetic field shape of four bump magnets to close the bump orbit, and introduced a scheme to suppress the stored beam oscillation induced by the nonlinearlity of sextupole magnets. These reduced the horizontal oscillation down to a third of the stored beam size. For the loss-free injection, beam collimators were installed upstream of the injection line. This realized the injection efficiency of ~100% under the restricted gap condition of in-vacuum insertion devices (ID). Since autumn 2003, we have been injecting the beams keeping the photon beam shutters opened and ID gaps closed. We developed a bunch-by-bunch feedback system to reduce the beam loss further with all the ID gaps fully closed by lowering the operating chromaticity. The operation with constant stored current is scheduled in June 2004. We present the overview and progress of the SPring-8 top-up operation focusing on our developments and results.  
Video of talk
Transparencies